Top-rated custom home builders.

Get matched with top custom home builders in Sumner, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your custom home building project in Sumner, WA?

Select your specific project to find the pro for you.

TRUSTED BY SUMNER, WA HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon54
    Verified custom home building reviews

Find Custom home builders in Sumner

Avatar for OCF Construction Inc
OCF Construction Inc
5.0(
6
)
Find a Custom Home Builder

Serving Sumner, WA and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

""I recently hired Oscar to remodle my bathroom and I couldn’t be happier with the results. It was professional, transparent, and answered all my questions. The crew worked efficiently, and thoroughly cleaned up after the job was done. My new bathroom looks fantastic and I Highly recommend this company to anyone needing Remodle their house !"
Recommended by83%of homeowners
Avatar for Legacy Construction
Legacy Construction
5.0(
11
)
Find a Custom Home Builder

Serving Sumner, WA and surrounding areas

In business since 1982

Emergency services offered

Warranties offered

"First off, we love our new decks! After 7 years of being scared to go out on our deck we can finally enjoy it. Everyone that helped and worked to get everything done was awesome. Bryce and Brady were both super nice and worked super hard. Bill was great to communicate with and would throughly go over any questions we had. We will definitely be using Legacy Construction again and highly recommend them to everyone!"
commercial tenant improvements
Additional Photos
Additional Photos
sheetrock work in progress
bathroom refresh

+30

Response time2 days
Response rate100%
Recommended by100%of homeowners
Remodeling Experts LLC
4.4(
132
)
Find a Custom Home Builder

Serving Sumner, WA and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"The whole project went better than expected and extremely fast with no compromises on quality. Russell's leads the business and is the main planner and money guy - and safe to say that the rates are very competitive. Russell's crew are largely family members and were all extremely polite and considerate as we were living in the house during the project. The more senior crew members are very experience and clearly know finish carpentry and cabinetry very well. The younger guys took care of the more labor intensive work, but again were very skilled and fast. We did our project in two stages, the first only taking ~3 weeks with the larger kitchen and whole house remodel taking around 8 weeks; any other company would have taken 2-3 times as long. They moved fast, fast, fast. Over time, we learned to trust all the guys and would hire them again in a heart beat. I would say that this company isn't the type to hold your hand entirely through the project; you need to be into the details and understand what you're paying for. Before you sign the contract, make sure to specify every detail in writing of what you want an the exact cost."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+89

Recommended by84%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home Builder

Serving Sumner, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Find a Custom Home Builder

Serving Sumner, WA and surrounding areas

In business since 2019

Free estimates

"Very professional! So happy that we found Eugen and his team to paint our house! What can I say, great customer service, excellent work in a timely manner! It is very rare when you find professional staff to deliver great results and warranty. Highly recommended!"
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
...
Showing 1-10 of 129
Custom Home Builders questions, answered by experts

Shipping container homes last at least 25 years on average, but they can last even longer with proper maintenance. Since shipping containers are made from metal, they’re quite vulnerable to rust and corrosion. This issue is exacerbated in coastal areas or areas with a lot of precipitation. To extend the life span of your container home, install siding that protects the exterior. 

On average, the cost of a home builder is about $150 per square foot, but that price can range from around $100 to $400 per square foot or more. That puts the typical price range of a standard, 2,000-square-foot house between $200,000 and $800,000. Some factors that affect the price of hiring a home builder include the following:

  • Location of your home and the living cost in the area

  • Type of foundation and framing you choose

  • Quality of the building materials

  • Footprint and layout of the house

  • Number of stories

  • Builder’s experience

Modular homes are a type of prefab home. Specifically, manufacturers first build modular homes in sections and then deliver them to the job site. The modules, or sections, are usually at least 70% finished before they arrive on your property.

In comparison, prefab homes arrive in panels or segments, and workers assemble them on-site. Generally speaking, modular homes tend to be more durable, and their consistent construction standards may mean you’ll have an easier time getting conventional home loans.

Green homes are often more expensive to build, averaging around $200 per square foot compared to the $150 per square foot you’d spend to build a standard home. However, green homes can save you money on your utility bills by consuming less energy or creating energy using solar panels or wind turbines on-site. They’re more expensive to build, but they often end up costing less in the long run.

A green home is one that focuses on conservation, with the goal often being net-zero carbon emissions and self-sustainability. It will often include some kind of self-generation equipment, like solar panels or a small wind turbine, high-efficiency electrical components and mechanicals, and high-quality insulation and air sealing to reduce the loss of conditioned air. Many green homes also include xeriscaping or rainwater collection to cut down on drainage and water consumption.

The Sumner, WA homeowners’ guide to custom home building

From average costs to expert advice, get all the answers you need to get your job done.