Top-rated custom home builders.

Get matched with top custom home builders in Orting, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your custom home building project in Orting, WA?

Select your specific project to find the pro for you.

TRUSTED BY ORTING, WA HOMEOWNERS

  • Average homeowner rating star icon3.8
    Average homeowner rating
  • Verified reviews icon37
    Verified custom home building reviews

Find Custom home builders in Orting

Avatar for Farmhouse Construction, LLC
Farmhouse Construction, LLC
4.9(
12
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2022

Free estimates

Warranties offered

"My shop build went flawlessly. It went up fast and looks great. I have nothing but good things to say about Pat and Farmhouse Construction. I highly recommend them and will use them again in the future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Sentri Homes
Sentri Homes
2.9(
38
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"I was very impressed with Sentri Homes - their customer service was excellent. They sent a subcontractor to install some vinyl laminate in my bathroom and he ended up getting glue all over the carpet in our bedroom. The sub ended up ghosting both me and Sentri, leaving me stuck with a ruined carpet. Sentri stuck with me for over a month to get the carpet replaced with the identical original and to get the vinyl job 100% completed. The carpet was a Home Depot exclusive and Sentri handled everything with them. I will be using Sentri for a much bigger renovation I have coming up soon, because I know that they will make sure everything gets done right no matter what problems come up. The vinyl looks great too."
25 neighbors recently requested a quote
Avatar for Coast Salish Construction & Electrical, LLC
Coast Salish Construction & Electrical, LLC
2.6(
5
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"This contractor delivered high quality service, dependability, good value, integrity - they completed the project exactly as they said they would. They kept us apprised of challenges so we could decide what to do next and they were fair with their price adjustment. Start to finish, they stayed on the project until it was done. Our project was complex - replacing a support structure that was not entirely visible when they did their quote. The end product was beautiful - and they ran a tidy operation. I highly recommend them - and will be using them again for other projects. Super impressed - and relieved to have such a positive experience on a critical project."
Marshall
Yelm Plaza
Yelm Plaza New 8000SQF 5 Suite
Response time1 day
Recommended by66%of homeowners
Ascended Constructions
New to Angi
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

Approved (Corporate)

In business since 2023

Offers commercial services

We’re a family owned and operated company that values honesty and integrity, and stands behind our work. We offer over 40 years of industry experience. We specialize in Asphalt Shingle Roofing installation, replacement, and repairs. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

1 neighbors recently requested a quote
Avatar for Legacy Construction
Legacy Construction
5.0(
11
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

In business since 1982

Emergency services offered

Warranties offered

"Legacy Construction has completed multiple projects and I couldn't be happier with the results. Their team is incredibly professional, always on time, and meticulous about quality. They listen carefully to the vision of their client and deliver a beautifully finished product that exceeds expectations. I especially appreciated their excellent communication throughout the project and their willingness to address any concerns promptly."
commercial tenant improvements
Additional Photos
Additional Photos
sheetrock work in progress
bathroom refresh

+30

Response time2 days
Response rate100%
Recommended by100%of homeowners
Avatar for Warrior Construction Services
Warrior Construction Services
5.0(
11
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"Warrior Construction and their crew treat you better than a customer, they care about you like family. They listen to your desires and act quickly to get your project going. They listen to your concerns, and make you feel valued as a customer. 10 out of 10 recommended, 5 stars, exceptionally good service and good people. Great quality work done promptly at an affordable cost, along with an amazing customer experience. Thanks Tom and Matt, and the Warrior Construction Crew."
Award Winning Serendipity
Divine Open Concept
Firehouse Farmhouse
Majestic
Serenity

+227

Recommended by100%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home Builder

Serving Orting, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
...
Showing 1-10 of 91
Custom Home Builders questions, answered by experts

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Yes, professionals offer mantel and surround customization for aesthetic appeal.

Typically, architects do not build homes in a hands-on sense of doing the actual framing, roofing, or other building. Architects usually do not have the training and experience to build the homes they design. An architect would need to know how to do the specific trades required to build a house, which is possible but not a common practice. A general contractor or homebuilder typically oversees the actual details of building the house that the architect designs.

Handypeople usually don’t hold trade licenses, so they typically aren’t qualified to tackle projects involving installing or making alterations to plumbing or electrical lines. Below are some jobs that a handyperson usually won’t be able to complete:

  • Installing plumbing for a new kitchen or bathroom

  • Replacing plumbing pipes

  • Installing or repairing septic systems

  • Running new electrical wiring

  • Installing a subpanel

Green homes are often more expensive to build, averaging around $200 per square foot compared to the $150 per square foot you’d spend to build a standard home. However, green homes can save you money on your utility bills by consuming less energy or creating energy using solar panels or wind turbines on-site. They’re more expensive to build, but they often end up costing less in the long run.

The Orting, WA homeowners’ guide to custom home building

From average costs to expert advice, get all the answers you need to get your job done.