Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Peshastin, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Peshastin, WA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Peshastin

Avatar for DCB LANDSCAPING LLC
DCB LANDSCAPING LLC
5.0(
3
)
Concrete Driveways - Install

Serving Peshastin, WA and surrounding areas

Approved

In business since 2025

Free estimates

Warranties offered

"Dylon did an amazing job in a day. He is easy to work with and thorough in every way. It was affordable and fast. I am sticking with these fellows! Thank for the help!"
Concrete Driveway Patch
Response time1 day
Response rate100%
6 neighbors recently requested a quote
Avatar for Elias Construction Services LLC
Elias Construction Services LLC
4.4(
9
)
Concrete Driveways - Install

Serving Peshastin, WA and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"Elias Contruction provided a detailed estimate after inspecting the roof and making some qualified recommendations. The project required a few change orders that were not clarified in writing. I would recommend hiring Elias if you get changes in writing. They cleaned up pretty well although they missed a few things due to finishing in the dark. Overall satisfied with the job and cost was 60% of other bids due to sheathing adjustment."
After
IKO Cambridge Earthtone C
IKO Dual Grey Dynasty
3 Tab
3 Tab

+24

Response time1 day
Recommended by14%of homeowners
VLINE LLC
New to Angi
Brick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Peshastin, WA and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

Quality Workmanship: We take pride in our attention to detail and unwavering commitment to quality. From the selection of materials to the execution of construction processes, we maintain the highest level of craftsmanship to ensure long-lasting and visually appealing results. Client Satisfaction: Our clients are at the heart of everything we do. We listen attentively to their needs, understand their vision, and collaborate closely throughout the construction process. We prioritize open communication, timely responses, and proactive problem-solving to ensure complete client satisfaction. Timely Completion: We understand the importance of delivering projects on time and within budget. Our efficient project management practices, combined with our dedicated workforce and reliable subcontractors, enable us to meet deadlines without compromising on quality.

Showing 1-10 of 47
Asphalt Driveways questions, answered by experts

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

Depending on project size, typically 1 to 3 days, including preparation and installation.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

The Peshastin, WA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.