Top-rated solar panel pros.

Get matched with top solar panel pros in Longview, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Longview, WA?

Select your specific project to find the pro for you.

Find Solar panel pros in Longview

NW Energy Group
5.0(
7
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Longview, WA and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"The entire process went very well. They kept me in the loop the entire time. The install went flawless. They were here when they said they would. They were professional. Most of all they help make sure you get all the incentives you qualify for and include a 25 year warranty on everything including labor. I would deff recommend NW Energy Group to whoever is looking into getting solar!"
Panel placement cad drawings
Main panel box
New roof
Proposal design
Additional Photos

+8

Recommended by100%of homeowners
Showing 1-10 of 29
Solar Panels questions, answered by experts

As long as your solar panels are properly installed without damage to your roof, they will not shorten the roof’s life span. Solar panels can act as a cover or barrier to your roof and help block external elements, such as debris, heat, and UV rays. Reduced exposure to the weather can extend your roof’s life.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

Yes, solar panel installation will require permits. The required permits will depend on where you live, as some states and cities have solar-specific permits, while others only require electrical permits to connect to the grid. In either case, it’s best to hire a reputable solar installer in your area, as a representative should handle all of the necessary permitting for you and will include the cost of the permits in your initial solar estimate.

In most states, solar installers need to be licensed and insured as solar professionals, although some states don’t have specific requirements for installers. You can use our state licensing tool to check if an installer you’re considering hiring holds the proper licensing. No matter where you live, a member of your solar panel installation company must be a certified electrician to connect your panels to your home and the electric grid.

The Longview, WA homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.