"Two of the Upgrade Remodeling pro's showed up and did the whole job in a excellent manner. The installed and cleaned up an in a superior manner. I would highly recommend for bathroom remodel or any other job you might have for them to do."
"Randy, our electrician, was excellent. He was professional, polite, and efficient. He explained what he was doing and was very ingenious when we discovered that the screws to hang the fixture were not long enough. He problem-solved the situation on the spot and was able to hang the fixture with a few minor adjustments. It looks great. When he replaced the basement light switch, he explained why it went bad. I was concerned that there was a wiring problem in our basement and he assured me that the rest of the wiring was done very well."
"Ferguson Home Improvements did a fantastic job. All the work that needed to get done, was finished beyond my expectations. The workers were very friendly. The job took a little longer that expected, but Ferguson Home Improvements were not at fault, the weather played a major factor with the deck stain and door installation. At the time the work was getting done, we received a lot of rain and storms. All in all, I would highly recommend Ferguson Home Improvements. "
"We are very pleased with Sky Home Improvements/Ben Meffley's work and communication. The work was done at a rental home so we really appreciate Ben's great communication and keeping us updated. Ben sent before and after pictures. There were a couple of things that Ben noticed on the roof that would become problems in the future. He called explained the situation and sent pictures. He was very straight forward and honest and sent pictures of the items he noticed. It was nice to be able to see (from the pictures) what needed to be done for ourselves. In the future if there is anymore work that needs to be done we would definitely call Sky Home Improvements. "
"Steven did an awesome job on our basement. He was very professional, flexible, and most importantly his work was quality for a fair price. I would recommend Townside to a friend without hesitation."
"I started the remodel myself and made a mess of a few things but Cougar Development Corp was able to repair my mistakes and give us a finished product that we can be happy to have our guests use. The vanity and shelving look amazing and the trim work done throughout is fantastic. At the end of the project I even requested caulking throughout to prepare for the paint due to my lack of equipment and they did it quickly and perfectly. "
"It was fine. The original design didn’t meet my needs based on the information I provided them. However, they revised the plans which worked out better for me. They were able to get the first draft to me pretty quickly."
Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction.
Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.
Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.
The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.
You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.
Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.
The Low Moor, VA homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
If your basement ceiling is low, there are ways to raise it. Learn more about the cost to raise a basement ceiling to be able to enjoy your basement and create a more usable space in your home.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.