Top-rated kitchen and bathroom remodelers.

Best kitchen and bathroom remodelers near Hideout, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your kitchen and bathroom remodel project in Hideout, UT?

Select your specific project to find the pro for you.

TRUSTED BY HIDEOUT, UT HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon105
    Verified kitchen and bathroom remodels reviews

Top-Rated Kitchen and bathroom remodelers in Hideout - Updated Nov 2026

5 Star Kitchen and Bath
4.1(
23
)
Bathroom - RemodelKitchen - RemodelShower Install or Replace+2 more

Serving Hideout, UT and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"I had 5 star kitchen and bath come remodel my bathroom. They did such a great job. the installers were great at making sure I was happy and that everything was perfect for me. I also had a sliding glass door put in. My old one had fallen apart before my scheduled install date. I called them and they found a way to get it put in early. I'm very happy with everything they did and I would use them again."
Response time1 day
Response rate100%
62 neighbors recently requested a quote
Avatar for Bath Fitter
Bath Fitter
3.9(
26
)
Shower Install or Replace

Serving Hideout, UT and surrounding areas

Approved

In business since 2010

Free estimates

Credit card accepted

"Brandon, Tg,were excellent. They were on time, worked well together, let us give feedback, cleaned up as they went along, made sure we knew what was happening during each step. I could not be happier, our shower was 30+ yrs. Pretty bad shape... I am so excited to have a new shower, that I didn't have to wait 2 to 3 weeks for... Cost was very affordable... The person who came to our house from Bath fitter,was knowledgeable, and product I believe is made in the USA.. Our installers were wonderful... They did such a wonderful job... Thanks Bath Fitter M B"
Shower
Response time1 day
Response rate98%
318 neighbors recently requested a quote
Avatar for Utah Flooring & Design
Utah Flooring & Design
3.5(
1,073
)
Bathroom - Remodel

Serving Hideout, UT and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"I hired the company after being sold and promised a floor and baseboards of better quality than I had. While the product quality met expectations, installation was a problem. First, the salesman disappeared and could not be reached once the company was paid. Warning to prospective customers, once money is paid customer service suffers. The Salesman handed the project over to my project manager Amy. Amy went on an extended vacation leaving the project in pieces. I begrudge no one a vacation, but ensure your customers and their projects are taken care of before you go. There was no replacement project manager. Vinyl install and demo were crazy. The vinyl installer showed up without tools. The Demo team damaged two walls and my bullnose corners were damaged and required repairs. I had to do the repairs because they couldnâ t. The laminate went in ok, but stairs werenâ t caulked in properly. I was told by several Utah Floor and Design technicians that the customer was supposed to caulk in the wood. My contract said I paid for finish installation of baseboards and trim. Friends that had had floors done were shocked that the wood wasnâ t caulked. Utah Floors and Design did not do caulk the floor, stairs, baseboards or trim. With no project manager or salesman to reach out to, Iâ m stuck finishing this project tomorrow. The baseboard carpentry was badly accomplished. I had to contact the company and complain. They sent a manager over who walked the house, shaking his head and asked who the carpenter was. He finished most of the work and fixed mistakes. In the end, however, the job is a â Câ at best. The caulk free baseboards and stairs look unfinished and amateur. The floor is quite nice, but there are areas I will need to correct, even though I believe they were part of the contract. The kitchen counters have a 1/4 inch gap between the floor and the cabinets, no 1/4 round was purchased or installed. The demolition was a â Câ , damage to the walls and corners. The vinyl installation was a â B+â they eventually got it done well. The laminate installation was an â A-â stairs could have been better. The baseboard carpenter was a â Dâ . Had to be fixed by manager. Finish, caulking and 1/4 round, â Fâ . Not done. Lastly, communication with customer, F-. This appears to be a corporate issue. There appears to be plenty of flooring projects right now. If you hire this company, you will be on your own. Good luck"
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right

+102

Response time6 hrs
46 neighbors recently requested a quote
Recommended by68%of homeowners
...
Showing 1-10 of 156
Kitchen and Bathroom Remodel FAQs, answered by experts

Options include frameless, semi-frameless, and framed designs with various glass types.

A bathroom addition project takes five to 12 weeks from the design stage to the end of construction, but it varies with the complexity of the project and your goals. Adding a small half bath takes less time than building a luxurious, high-end primary bathroom. It could also take longer if you need to run new electrical and plumbing in the room.

Installing a clawfoot tub with a minimum of 6 inches of clearance from surrounding walls allows ample room for the faucet and pipework, makes cleaning easier, and reduces the chance of moisture being trapped between the tub and the walls. It might need to be closer if the faucet comes directly out of the wall.

Adding a bedroom or a second bathroom typically has the biggest positive effect on a home's value. These additions can increase your home's square footage and move it into a new category (e.g., from a two-bedroom to a three-bedroom), which is highly attractive to many families looking to upsize. On a larger scale, adding a second floor can also significantly increase a home's value by creating new possibilities for living and storage space. However, there is an upper limit where adding more bedrooms, such as in a nine-bedroom home, may not proportionally increase value.

Just like the rest of your roof, a dormer will last as long as the life span of the materials used in construction. Slate, clay, and concrete roofing can last for over a century, whereas more standard roofing materials, such as asphalt shingles, last closer to 30 years. The structure of the dormer itself, however, should last the roof's lifetime when properly maintained. Only the window, insulation, and eaves may require repairs over time.

The Hideout, UT homeowners’ guide to kitchen and bathroom remodels

From average costs to expert advice, get all the answers you need to get your job done.