Top-rated excavation pros.

Get matched with top excavation pros in Red Oak, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Red Oak, TX?

Select your specific project to find the pro for you.

TRUSTED BY RED OAK, TX HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon28
    Verified excavation services reviews

Find Excavation pros in Red Oak

Sonart Construction Corp.
4.8(
245
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessLandscape - Minor Grading or Resloping

Serving Red Oak, TX and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"I hired Sonart Construction to remodel my sons bedroom and they did a great job. The price was very good, they was on time with their job, and it came out beautiful. Very good company."
Response time10 hrs
Response rate94%
Recommended by83%of homeowners
Avatar for Henry Junk Removal Services
Henry Junk Removal Services
5.0(
4
)
Landscape - Minor Grading or Resloping

Serving Red Oak, TX and surrounding areas

Approved

"Just a lovely man. Works with his wife and mom. Came over, cleared out problem shed, swept it, and did it all in about an hour and 1/2. We were really impressed. We plan to use him again as our cleanup continues…"
74 neighbors recently requested a quote
Avatar for 888 BUILDERS, INC.
888 BUILDERS, INC.
4.0(
20
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and ClearingExcavation - Major Grading or Resloping+2 more

Serving Red Oak, TX and surrounding areas

Approved

In business since 1990

Free estimates

Small jobs welcome

"I am going to be as honest as possible to help out the next person in their decision to hire him. First and foremost he is a great guy and friendly, he knows what he is doing and his workmanship is top notch. I initially hired him for a patio / porch and then a 3car garage. When he started it was going well and after I paid him a little more so he could get ahead, he would run out of material and would just leave without saying anything. His work was impressive but I felt he became complacent and started cutting corners because he ran out of money to buy materials. As an example: Not planning ahead, he left a portion of my roof exposed and the rain went into my home causing considerable sheet rock and insulation damage. He could have covered it to prevent some of the damage but his response was â I canâ t control the weatherâ . That was disappointing as I had to cover that bill myself. On the 3 car garage, I ran into the same problem. He started slowing down I was a little disappointed with the timelines. He would show up and work a few hours then leave. Despite me asking for a blueprint or plan. He failed to provide one. On several occasions he ran out of material and the work was delayed. The workers he had would come to me and say they would have to leave because there was no more material. I did notice that when you asked him questions he would get a little defensive. Unfortunately some of his hard work was tarnished by his lack of planning despite being paid in advance. Half of my structure remained exposed due to lack of planning on his part. Towards the end of the project he was piecing boards together and using left over scraps as patch up work. I did question him on a few things like hauling of the leftover material but he referred to the contract and said it was not in the contract. However, he was willing to charge me more money to get it removed. In order to end in good terms, I just wanted him to finish what he started and paid him to avoid further disappointment. I still have left over material to haul away, a few areas to patch, tape and seal. I would recommend him because of the skill he has however, I may or may not hire him again. I would let the next person know to MAKE SURE you read the contract very carefully, ask questions and request plans with a timeline or you will have to hire other people to finish his work. I have plenty of pictures to share if interested."
El Barco
Response time1 day
31 neighbors recently requested a quote
Recommended by57%of homeowners
...
Showing 1-10 of 303
Excavating questions, answered by experts

The average cost for pool excavation is $2,500. This cost can range from $450 to $4,500, depending on the pool shape and size, time of year, and any need to move buried utilities. 

When excavating for your pool, you might have to move existing utilities. You can expect to pay an additional $15 to $25 per linear foot to move gas lines. To move a septic system, it’ll cost an additional $2,000 to $20,000. A pool that is 10 feet by 12 feet averages $450 to excavate, and a 20-foot-by-40-foot pool averages $3,020.

The best type of soil to build on is a mixture of sand and clay, known as loam soil. Loam soil has the best combination of these soil types to build a foundation on. The clay particles help with water retention, so it won’t erode like sandy soil might, and the sandy particles help with drainage, so you won’t see unsafe soil expansion or have an increased risk of leaks from water sitting against your foundation.

Some two-in-one tools and machines do both jobs, and those could be the right solution for smaller residential projects. However, the phrase “use the right tool for the job” definitely applies to digging. For the best results, get two separate tools for your trenching and landscape edging projects or call a pro to take care of everything for you.

Excavation is priced in cubic yards, so you’ll need to find the volume of the area in order to calculate costs. Multiply the length, width, and proposed depth of your excavation site, then convert it into yards to get the volume. Multiply this figure by the price per cubic yard.

Most homeowners can measure by hand to get a rough estimate, even if it’s tedious. You may want to pull out a tape measure or use a string to help mark the area.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Red Oak, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.