Top-rated excavation pros.

Get matched with top excavation pros in Maypearl, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Maypearl, TX?

Select your specific project to find the pro for you.

TRUSTED BY MAYPEARL, TX HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon27
    Verified excavation services reviews

Find Excavation pros in Maypearl

Sonart Construction Corp.
4.8(
245
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessLandscape - Minor Grading or Resloping

Serving Maypearl, TX and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"I hired Sonart Construction to remodel my sons bedroom and they did a great job. The price was very good, they was on time with their job, and it came out beautiful. Very good company."
Response time10 hrs
Response rate94%
Recommended by83%of homeowners
Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)
Building Site - Preparation and Clearing

Serving Maypearl, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
40 neighbors recently requested a quote
Recommended by77%of homeowners
Horst Construction
4.8(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Maypearl, TX and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"EXCELLENT service! I could not recommend these guys more. I'll be using them moving forward for all of my farm and road work. Trust is a BIG ISSUE with me and they proved to be totally trustworthy and an expert in this field. Mr. Horst personally inspected our place, made the perfect recommendations on how to fix our issues and did a fantastic job."
Road entrance
Road
Road 2
House Pad on Lot 2
3 House pads

+21

Response time1 day
Response rate90%
Recommended by83%of homeowners
Avatar for Reclaim Your Space LLC
Reclaim Your Space LLC
5.0(
1
)
Landscape - Minor Grading or Resloping

Serving Maypearl, TX and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

"Hired the crew to remove an old shed in my backyard. They were quick to respond on the estimate and to schedule the job! Was in and out in just a few hours. Team was great to work with and professional throughout the process!"
Sasche debris removal
Sasche debris removal
Sasche debris removal
Sasche debris removal
Sasche debris removal

+1

19 neighbors recently requested a quote
...
Showing 1-10 of 214
Excavating questions, answered by experts

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

The Maypearl, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.