Top-rated excavation pros.

Get matched with top excavation pros in Maypearl, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Maypearl, TX?

Select your specific project to find the pro for you.

TRUSTED BY MAYPEARL, TX HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon27
    Verified excavation services reviews

Find Excavation pros in Maypearl

Sonart Construction Corp.
4.8(
245
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessLandscape - Minor Grading or Resloping

Serving Maypearl, TX and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"If you are looking for a solid construction company sonart is the way to go for sure! All I could say was wow aside from the fact that my mouth was completely open for a solid five minutes LOL! The house was built around the 50s and hasnâ t been updated since the original build. To see our bathrooms brought more to a modern the lights was honestly heartwarming I know my mother would have appreciated this!Thank you again guys for your hard work!"
Response time10 hrs
Response rate94%
Recommended by83%of homeowners
Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)
Building Site - Preparation and Clearing

Serving Maypearl, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
39 neighbors recently requested a quote
Recommended by77%of homeowners
Horst Construction
4.8(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Maypearl, TX and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"EXCELLENT service! I could not recommend these guys more. I'll be using them moving forward for all of my farm and road work. Trust is a BIG ISSUE with me and they proved to be totally trustworthy and an expert in this field. Mr. Horst personally inspected our place, made the perfect recommendations on how to fix our issues and did a fantastic job."
Road entrance
Road
Road 2
House Pad on Lot 2
3 House pads

+21

Response time1 day
Response rate90%
Recommended by83%of homeowners
Avatar for Reclaim Your Space LLC
Reclaim Your Space LLC
5.0(
1
)
Landscape - Minor Grading or Resloping

Serving Maypearl, TX and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

"Hired the crew to remove an old shed in my backyard. They were quick to respond on the estimate and to schedule the job! Was in and out in just a few hours. Team was great to work with and professional throughout the process!"
Sasche debris removal
Sasche debris removal
Sasche debris removal
Sasche debris removal
Sasche debris removal

+1

19 neighbors recently requested a quote
...
Showing 1-10 of 216
Excavating questions, answered by experts

It can take several weeks for the ground to settle after removing a tree, and the soil under larger, more mature trees can take months. The deeper the tree has been ground under the soil, the longer it will take to settle. However, this extra depth can help you plant new landscaping sooner because you’ll have more space for fresh soil.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Yes, you can excavate in the winter, but it might make the job harder. Frozen ground is harder to dig, and snow or ice can make the work site more hazardous. A contractor may need special equipment and techniques, such as ground-thawing methods, to break through frozen soil. Although winter excavation is possible, it may take longer and be more costly than excavating during warmer months.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

The Maypearl, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.