Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Moody, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Moody, TX?

Select your specific project to find the pro for you.

TRUSTED BY MOODY, TX HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon13
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Moody

Avatar for D & D Construction
D & D Construction
4.3(
24
)

Serving Moody, TX and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Dakota and his team were professional, polite, did a great job in prepping and coating the driveway. I was really impressed and exceeded my expectations. Would hire again. Thank you team!"
Driveways - Asphalt Project
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Response time1 day
Response rate100%
21 neighbors recently requested a quote
Casa De Kai
4.5(
6
)

Serving Moody, TX and surrounding areas

Approved

In business since 2024

Free estimates

Warranties offered

"We recently had tile installed and could not be happier with the results. From start to finish, the customer service was outstanding — professional, responsive, and attentive to every detail. The craftsmanship and quality of the installation truly exceeded our expectations. The tile layout came out perfect, the cuts were clean and precise, and the finished product completely transformed the space. You can tell they take pride in their work and genuinely care about customer satisfaction. Highly recommend to anyone looking for quality tile work done right the first time!"
Sheet Vinyl
Ceramic Tile
Town Creek Townhomes
40 neighbors recently requested a quote
...
Showing 1-10 of 185
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Several materials are suitable for steep driveways. Gravel and crushed stone are affordable options that provide good traction. Permeable pavers—such as plastic, rubber, or concrete—filled with gravel or crushed stones are also excellent, as they allow water to drain without causing erosion and perform well in ice and snow. Another option is resin, which can be coated with an anti-slip finish and helps prevent puddles. For added stability, you can install a retaining wall to prevent pavers and gravel from shifting over time.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

Sometimes, when people talk about asphalt driveways, they’re actually referring to asphalt concrete, which is a completely different compound. Asphalt concrete is asphaltic cement combined with sand or grit. It is significantly more lasting and durable than regular asphalt but also much more expensive. If you’re considering using asphalt concrete, ask an asphalt company for their expert opinions.

The Moody, TX homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.