Top-rated excavation pros.

Best excavation pros near Monterey, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Monterey, TN?

Select your specific project to find the pro for you.

TRUSTED BY MONTEREY, TN HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon22
    Verified excavation services reviews

Top-Rated Excavation pros in Monterey - Updated Nov 2026

Avatar for Mason's Tractor Worx
Mason's Tractor Worx
5.0(
11
)
Landscape - Minor Grading or Resloping

Serving Monterey, TN and surrounding areas

Approved

In business since 2016

Free estimates

Credit card accepted

"Responded quickly Strong communication Provided ideas and solutions for my project Eddie removed tree stumps, leveled an area, and put down sand so that our area is ready for an above ground pool installation."
Tractor Worx
Response time9 hrs
Response rate91%
Recommended by90%of homeowners
Paul C. Winchester Construction
3.8(
7
)
Landscape - Minor Grading or Resloping

Serving Monterey, TN and surrounding areas

Approved

In business since 1987

Free estimates

Customers say: Quick response

"Paul and crew were fantastic. He came out several times to quote the work and to rework the quote to better fit in our budget. We had an existing deck extended and a ramp added, a new garage stairway built and a new deck built for our front entry. Our big focus for this project was improving access from the house to the outdoors for both my handicap husband and our aging arthritic dogs. He’s a busy guy (because he is good) therefore we had to wait awhile for the project to begin but it was worth the wait. They showed up on time every day until the project was completed. He asked for design clarification when necessary and changed coarse without complaint when changes needed to be made. Honest, trustworthy and talented. The quality of his (and crews) work was top notch. Paul takes pride in the quality of the materials used and his workmanship which shows in the end result. The deck in the front is a beautiful extension of our home that not only “classed up” the entry but extended our livable space in this home. Both my husband and I have many decades of home improvement under our belt and can say with confidence that Paul is a fantastic resource for any project you maybe considering. Very pleased."
Response time2 days
12 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 98
Excavating FAQs, answered by experts

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

The rules and regulations regarding groundwater use vary between states. To find out if you can dig a well on your property, you’ll have to consult these regulations, address any compliance requirements, and get the appropriate permits. It’s also important to check that your intended location has the right geology and water table to support a well.

Most states do not require excavation companies to hold specific licenses, but many require at least a contractor’s license. Additionally, heavy equipment operators require a special commercial equipment license to operate machinery required for excavation. You can use Angi’s contractor licensing tool to confirm that an excavation company you’re considering hiring is fully licensed. You should also make sure that the excavation team is fully insured before allowing them to work on your property.

Excavations take a few days or up to a few weeks. The time it takes to excavate an area depends on the size of the area, the type of soil, the type of excavator, and even the time of year, since winter can make digging up the ground more difficult.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Monterey, TN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.