Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Cedar Grove, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Cedar Grove, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Cedar Grove

Avatar for Townes Bushhogging & Driveway Service
Townes Bushhogging & Driveway Service
4.8(
5
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Cedar Grove, TN and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"My husband and I had dead and near dead shrubs after the unusually cold winter. Casey Townes quickly assessed our needs and fulfilled our requests for a very reasonable cost. He is an extremely hard worker and the finished project is beautiful. We highly recommend him for your landscaping jobs."
35 acres of high grass
15 acres of pasture
Before gravel spread
After repair
Before

+2

Response time1 day
Response rate100%
Recommended by100%of homeowners
A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Cedar Grove, TN and surrounding areas

In business since 1985

Free estimates

"Had our very large driveway installed 9-10-20 Wayne and Marques and his team of great guys were very helpful and courteous. His team worked very diligently and got the job done. We highly recommend this company. Wayne returned calls when left a message very quickly. Would definitely use this company again."
Response time3 days
Recommended by81%of homeowners
Showing 1-10 of 48
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

The Cedar Grove, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.