Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Sardis, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Sardis, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Sardis

Avatar for Los Amigos Concrete of Henderson TN
Los Amigos Concrete of Henderson TN
5.0(
14
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Sardis, TN and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Los Amigos poured concrete slab and built an outdoor pawtio for our dog shelter. We were extremely pleased with their work. They showed up on schedule, worked fast, used top quality materials, cleaned up work site when job was completed and were extremely polite with shelter volunteers. We have another project planned for the spring and will be using them again. Highly recommend them!"
Foundation.
Floor
Pole barn
Pole barn
Pole barn

+47

Response time8 hrs
Response rate92%
Recommended by100%of homeowners
A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Sardis, TN and surrounding areas

In business since 1985

Free estimates

"Wayne came to our home to survey the repairs the same day I called and requested a quote. The A&W crew arrived a few days later and made the repairs in just a couple of hours. They were polite, professional and easy to work with. I would recommend A&W to anyone needing asphalt work."
Response time3 days
Recommended by81%of homeowners
Avatar for Old School Construction
Old School Construction
5.0(
3
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+4 more

Serving Sardis, TN and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"All workers showed up on time and the work progressed on time. The weather was a factor but the job was finished in time and in a very professional manner. There was never a time when I had to worry if the job was being done the way it should be. There was a section of roofing on the back of the house that was done by an armature at best that caused a lot of wood rot. The foreman of the job showed me how it could be repaired and saved me over $1500 on the job.

I plan to use this provider in the future for work inside my home."
Additional Photos
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 47
Asphalt Driveways questions, answered by experts

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Sardis, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.