Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Milan, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Milan, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Milan

Alvarez Concrete
New to Angi
Concrete Driveways - Install

Serving Milan, TN and surrounding areas

Approved

In business since 2016

Free estimates

With over 25 years of experience in the industry, Alvarez Concrete is a leader in the industry. We offer a variety of concrete and masonry specialties that can be customized to each of our clients needs. We value building long lasting relationships with each of the clients that we work with through the quality of our work and attention to detail. Book an appointment with us today!

Driveway
Driveway
Driveway
Concrete
Concrete

+5

Response time7 hrs
A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Milan, TN and surrounding areas

In business since 1985

Free estimates

"Had our very large driveway installed 9-10-20 Wayne and Marques and his team of great guys were very helpful and courteous. His team worked very diligently and got the job done. We highly recommend this company. Wayne returned calls when left a message very quickly. Would definitely use this company again."
Response time3 days
Recommended by81%of homeowners
...
Showing 1-10 of 55
Asphalt Driveways questions, answered by experts

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Common alternatives to a gravel driveway include concrete, asphalt, brick, stone pavers, and permeable pavers. Concrete and asphalt are generally the most affordable options. However, concrete can be prone to cracking in cold climates, while asphalt may soften in areas with high heat and direct sun exposure. For enhanced curb appeal, brick, stone, and permeable pavers are popular choices, though their installation can be more expensive due to intricate designs. Stone pavers offer a natural look and are sometimes installed with gravel around them. Both permeable pavers and brick driveways provide excellent drainage, which helps prevent flooding and reduce water runoff.

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Milan, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.