Top-rated asphalt driveway pros.

Best asphalt driveway pros near Bruceton, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bruceton, TN?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Bruceton - Updated Nov 2026

Avatar for Asphalt 24/7
Asphalt 24/7
4.7(
16
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Install- For Business

Serving Bruceton, TN and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"Very professional, Mr. Harrison walked me through the whole process start to finish. The crew was very punctual and finished the driveway a day ahead of schedule. Would definitely recommend doing business with them."
Paving driveway
Paving driveway
Additional Photos
Additional Photos
Additional Photos

+4

Response time1 day
Response rate100%
7 neighbors recently requested a quote
Avatar for Wortham Masonry
Wortham Masonry
New to Angi
Concrete Driveways - InstallBrick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Bruceton, TN and surrounding areas

Approved

In business since 1990

Free estimates

We have the experience and we are committed to providing quality workmanship and superior customer service on all our applications. We at Wortham Masonry strive to maintain our reputation as a high quality, very service oriented company with our main focus being customer satisfaction.

4 neighbors recently requested a quote
Avatar for Townes Bushhogging & Driveway Service
Townes Bushhogging & Driveway Service
4.8(
5
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Bruceton, TN and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"My husband and I had dead and near dead shrubs after the unusually cold winter. Casey Townes quickly assessed our needs and fulfilled our requests for a very reasonable cost. He is an extremely hard worker and the finished project is beautiful. We highly recommend him for your landscaping jobs."
35 acres of high grass
15 acres of pasture
Before gravel spread
After repair
Before

+2

Response time1 day
Response rate100%
Recommended by100%of homeowners
Showing 1-10 of 49
Asphalt Driveways FAQs, answered by experts

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The Bruceton, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.