Top-rated above ground pool installation pros.

Best above ground pool installation pros near Allen, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Allen, SD?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Allen - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Allen, SD and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools FAQs, answered by experts

Installation typically takes 4-8 weeks, including site preparation and liner installation.

Whether or not a pool needs a dedicated circuit depends on the electrical needs of the motor, lights, and pump. Keep in mind that pool motors can use a lot of electricity. A dedicated circuit can prevent the breaker from tripping whenever you use the pool. A small motor for an equally small pool may only need a GFCI outlet. It’s best to plug it directly into the outlet rather than using an extension cord. You should also consult an electrician to ensure your pool’s electrical system is in accordance with local regulations.

Spools can come as small as 10 x 6 feet, so they don’t take up a lot of room in your yard. You’ll want to plan for pool decking, fencing, and other features that may take additional space, but for the most part, a spool’s small footprint makes it a great choice when you don’t have much yard space to spare.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

Liquid chlorine is better for shock treatments or instances where you need to raise your chlorine levels quickly. Tablets are better for regular maintenance. Tablets take more time to dissolve but require less effort. You don’t need to measure out volume, and you can set them in a floater and let that do the work.

The Allen, SD homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.