Top-rated basement remodelers.

Get matched with top basement remodelers in Williamston, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Williamston, SC?

Select your specific project to find the pro for you.

TRUSTED BY WILLIAMSTON, SC HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon11
    Verified basement remodels reviews

Find Basement remodelers in Williamston

Avatar for Bradley Construction, LLC
Bradley Construction, LLC
3.8(
93
)
Basement - Remodel

Serving Williamston, SC and surrounding areas

Approved

In business since 2009

Free estimates

Warranties offered

"I highly recommend Bradley Construction They are great people, very good workmanship fast service. I have to thank Rick, who did the estimate for the job. He was accurate in his bidding, Explained everything from start to finish. Bradley demoed my back deck and rebuilt it better than original, plus removal of old deck hauled away. This company you can TRUST. George Van Valkenburgh Seneca S.C."
1748959
 Carpentry Super Service Award
 Basement Remodel
1748960
 Painting Super Service Award

+77

Response time2 days
Response rate95%
41 neighbors recently requested a quote
Avatar for Bradley Construction LLC
Bradley Construction LLC
4.2(
357
)
Basement - Remodel

Serving Williamston, SC and surrounding areas

In business since 2009

Free estimates

Warranties offered

Bradley Construction, LLC, is a full-service construction company. We specialize in site-built, residential construction and remodeling. We do not work on mobile homes, manufactured housing, or trailers with a metal roof. We are LICENSED, BONDED, AND INSURED!\nOur team of professionals will handle all aspects of your new construction project, full home remodel, kitchen remodel, bathroom remodel, garage, build additions, sunroom, build deck & porches and basement remodel.\nWe deliver personal service with the goal of making your project fun and easy. \nYou can count on us to provide professional service with close attention to detail. We are looking forward to working with you!\n\nWe are a Member of the Better Business Bureau and the National Home Builders Association. \nFree Estimates.

9 neighbors recently requested a quote
Recommended by89%of homeowners
DreamMaker Bath & Kitchen
4.1(
14
)
Basement - Remodel

Serving Williamston, SC and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"They did a beautiful job. We have been very pleased with everything they have done us for us. I have recommended them to other who have used them for remodeling projects. They do great work. They are not the cheapest nor the most expensive but they are dependable. They take care in expeditious fashion. At one time, our hot water heater started leaking by Monday evening, Gene and his assistant installed a water heater. They clean up, they don't leave a mess."
Dream Kitchen
Dream Kitchen
Dream Kitchen
Dream Kitchen
Dream Kitchen

+9

Recommended by88%of homeowners
Avatar for Nexgen Contractors LLc
Nexgen Contractors LLc
4.7(
6
)
Basement - Remodel

Serving Williamston, SC and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Building relationships through renovations."\n\nNexgen's team goal is to ensure a smooth, stress free process through your project needs from start to finish.\n\nAs an owner with over 15 years personal experience in custom home building and renovation, you can expect to experience a professional and attentive level of service that will exceed your expectations. By carefully understanding your ideas of what you want to accomplish, we can ensure that the design is innovative, functional, and practical.\n\nWe look forward to working with you!\n\nSteven Eby

Additional Photos
Additional Photos
Additional Photos
Before
After

+14

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Williamston, SC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 52
Basement Remodel questions, answered by experts

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The Williamston, SC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.