Top-rated basement remodelers.

Get matched with top basement remodelers in Pine Grove, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Pine Grove, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Pine Grove

Avatar for Leid's Carpentry, LLC
Leid's Carpentry, LLC
4.5(
11
)
Basement - Remodel

Serving Pine Grove, PA and surrounding areas

Approved

In business since 2003

Free estimates

Warranties offered

"Really happy with Leid?s Carpentry. Laverne and Anthony did a great job. He knows how to make things happen. They made sure everything was ready for the next part of the project! Great coordination! Great to work with, and I definitely recommend them."
Compl Kitchen Remdl
Compl Kitchen Rmdll
Compl Kitchen Rmdl
Patio Roof Addtion
Patio Roof Addition

+25

Response time4 hrs
5 neighbors recently requested a quote
Recommended by30%of homeowners
Avatar for WilMarc Construction Inc
WilMarc Construction Inc
4.4(
11
)
Basement - Remodel

Serving Pine Grove, PA and surrounding areas

In business since 1983

Free estimates

Emergency services offered

"We are so happy with the work of WilMarc Construction- we have had them do two major home remodels for us- both times, Willie came out and listened to our ideas and what we had in mind and then gave thoughts of his own (which were always better than ours) and the results were both beautiful and reasonable. Our first project was redoing a kitchen and we had thought an extension would be best and he came up with a more economical solution to combine a couple of rooms, change windows and location of the bathroom. He always did what he said he was going to do and didn't overcharge. Our last project was just finished- installing hardwood floors and redoing two upstairs bathrooms. When we started pricing out flooring at a couple of flooring places, we realized it would be better to ask Willie his opinion and get an estimate and we ended up doing two bathrooms as well as the floors and replacing the stairs--all things that needed to be done for a reasonable cost. I would recommend asking Willie his opinion on what your plan is and your choices, he has done a lot of projects and sees the final project so with regards to durability and beauty he can offer really helpful suggestions with material."
Recommended by100%of homeowners
Alpine Contracting Company
3.9(
24
)
Basement - Remodel

Serving Pine Grove, PA and surrounding areas

In business since 1978

Free estimates

Emergency services offered

"i had my bathroom fully remodeled by alpine construction and am very happy with the results. not only is their craftmanship superb but they were consistently on time. the three men i worked with were kind and curtious and listen to what i wanted out of this experience and made it happen. my bathroom is beautiful and looks just like i pictured it. my husband and i are looking forward to future remodeling projects with alpine construction"
Recommended by90%of homeowners
...
Showing 1-10 of 79
Basement Remodel questions, answered by experts

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The Pine Grove, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.