Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Pilot Rock, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Pilot Rock, OR?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Pilot Rock

Avatar for Elias Construction Services LLC
Elias Construction Services LLC
4.4(
9
)
Concrete Driveways - Install

Serving Pilot Rock, OR and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"Elias Contruction provided a detailed estimate after inspecting the roof and making some qualified recommendations. The project required a few change orders that were not clarified in writing. I would recommend hiring Elias if you get changes in writing. They cleaned up pretty well although they missed a few things due to finishing in the dark. Overall satisfied with the job and cost was 60% of other bids due to sheathing adjustment."
After
IKO Cambridge Earthtone C
IKO Dual Grey Dynasty
3 Tab
3 Tab

+24

Response time1 day
1 neighbors recently requested a quote
Recommended by14%of homeowners
Avatar for JEFF'S LAWN CARE & LANDSCAPING
JEFF'S LAWN CARE & LANDSCAPING
4.8(
29
)
Brick and Stone Driveways & Floors - InstallGravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business+1 more

Serving Pilot Rock, OR and surrounding areas

In business since 2002

Emergency services offered

Credit card accepted

"Jeff's Lawn Care sent three workers to re-work an over-grown flower bed. The workers dug out three bushes from the area and removed the existing landscape fabric, rocks, and mulch. They then planted two small shrubs. They covered the newly-cleaned area with mulch and dug a hole for a small tree that hadn't arrived yet from a Pasco nursery. The workers were polite, showed up when they were scheduled, and cleaned up their mess when they finished. They were careful not to disturb the underground sprinklers. They returned a few days later and planted the small tree. I was disappointed that no amendments were added to the newly un-covered soil before planting and mulching. The workers were not provided with any soil amendments, so obviously they did not know that task needed to be done. I thought that task was part of the bid. After the workers left, I re-planted the two new bushes, using amended soil that I created. Later, I told one of the owners that I was disappointed about the condition of the soil. I was told that it is only necessary to amend the soil in the locations where items are being planted. But the workers were not told to do that, and were not provided with the relevant material. I was charged the bid amount for the work, although it took two tries to get the bill correct. I like this company and employ them for a number of on-going services. I just wasn't totally satisfied with this particular landscaping job."
Additional Photos
Additional Photos
Additional Photos
Recommended by92%of homeowners
Showing 1-10 of 22
Asphalt Driveways questions, answered by experts

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Pilot Rock, OR homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.