Top-rated excavation pros.

Get matched with top excavation pros in Mccurtain, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Mccurtain, OK?

Select your specific project to find the pro for you.

Find Excavation pros in Mccurtain

Collatt Construction, LLC
4.8(
5
)
Landscape - Minor Grading or Resloping

Serving Mccurtain, OK and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"Stephen and his crew did a great job rebuilding my deck. It was a big job due to its size, but they built a very solid deck and did everything I wanted. He also made sure some damage around my house due to water problems got fixed. I have recommended him to several friends."
Response time1 day
Response rate88%
26 neighbors recently requested a quote
Avatar for S&S Construction and Ecavation L.L.C
S&S Construction and Ecavation L.L.C
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Mccurtain, OK and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction, from start to the completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job\n

Cattle pens pad
Cattle pens pad
1 neighbors recently requested a quote
Avatar for G&S Contracting LLC
G&S Contracting LLC
5.0(
5
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Mccurtain, OK and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Ladies, if you have a husband or on your own, please get a hold G&S Contracting LLC. Stop putting repairs off. Mike is a man of his word and I guarantee he will not empty your pocketbook. Things he has done for me was put up 2 ceiling fans, a window a/c unit, 2 gates on my porch to make me feel safe. All things I could not do on my own. The list goes on and on. Please call, you'll be glad you did. He is a true handyman."
Harp renovation
New deck on Randall home
Kitchen before flooring
Home renovation
New Construction-Residential.

+76

Recommended by100%of homeowners
...
Showing 1-10 of 55
Excavating questions, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The best method for digging a trench depends on the scope of the project. For a short, shallow trench (less than 2 feet deep) in light, soft soil, digging by hand may be sufficient. However, digging by hand is labor-intensive, so consider the effort required. A machine trencher is the better option for longer trenches (over 100 feet), deeper ones, or when dealing with difficult soil conditions, such as rocky or hard ground, or obstructions like tree roots. A machine can save significant time and energy in these situations.

If you don’t wish to dig it out and convert it into a finished basement, you can still encapsulate your crawl space to protect it from damage for an average cost of $5,500. Finishing a crawl space beyond this isn’t really worthwhile, as the low ceilings mean you won’t be able to use the area as living space.

The easier way to find buried sprinkler lines is to use the plan from the professionals who installed the system. If you don’t have professional plans, listen for running water on your lawn when you turn on the system. You may also spot wet areas, giving you an idea of where the heads are. Once you find the sprinkler heads, you’ll likely be able to connect the dots between them, revealing the system below.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Mccurtain, OK homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.