Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kiowa, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kiowa, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Kiowa

C-Mac Trucking LLC
New to Angi
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Kiowa, OK and surrounding areas

Approved

In business since 2012

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumers' needs. It is our mission to provide excellent workmanship, and complete customer satisfaction from start to completion of a project. In order to understand the needs, and expectations of our customers, we take great care to work, and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time7 hrs
PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Kiowa, OK and surrounding areas

In business since 2002

Credit card accepted

"I recently bought a house and a few issues were pointed out by inspections. These guys were referred to me by friends and after getting a few bids, I had them fix my problems. They werent the cheapest, but they fixed my issues and that was all that really mattered to me.
"
Recommended by93%of homeowners
Avatar for Creative concrete construction - Inicio  Facebook
Creative concrete construction - Inicio Facebook
4.2(
10
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Kiowa, OK and surrounding areas

In business since 2001

Free estimates

Warranties offered

"Some of my answers are a little early however I have had experience in this area and believe that this Company will do the best job that I have ever had done.. Very knowable in the work that needs to be done and how to get it done right!! They are ready to do the concrete but I'm not quit yet.."
Stamped concrete
Stamped concrete
Stamped concrete
Stamped concrete
Stamped concrete

+21

Response time1 day
Recommended by80%of homeowners
Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Kiowa, OK and surrounding areas

In business since 1947

Free estimates

"The services performed resulted in a very beautiful and functional game room area.  My wife and I are very pleased with the work.  Roger, his primary employee, Dave, and all of the sub contractors he used were outstanding.  For example, the texture blends and paint matches were exceptional.  The travertine floor is perfect.  Cabinets were of of good quality and as ordered.  The carpet was modified and replaced for a nice cost savings.  Our new room appears that it was always configured in its current state. Roger was very accessible, genuinely attempted to address all of our requests and was very easy to work with."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
...
Showing 1-10 of 63
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

Professionals ensure a solid base and smooth finish, enhancing durability and appearance.

The Kiowa, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.