Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Haileyville, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Haileyville, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Haileyville

Avatar for Concrete Brothers
Concrete Brothers
New to Angi
Concrete Driveways - Install

Serving Haileyville, OK and surrounding areas

Approved

In business since 2014

Free estimates

Credit card accepted

Our specialties include SIDEWALKS, DRIVEWAYS, HOUSE PADS, and BARN SLABS. We are mostly available everyday of the week/weekend and can get the job done in a couple of days depending on the size and weather conditions. Ive been finishing concrete for 10+ years now and got my start in a family owned business.

Conex home pad
House pad
Additional Photos
Additional Photos
Additional Photos

+8

5 neighbors recently requested a quote
PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Haileyville, OK and surrounding areas

In business since 2002

Credit card accepted

"I recently bought a house and a few issues were pointed out by inspections. These guys were referred to me by friends and after getting a few bids, I had them fix my problems. They werent the cheapest, but they fixed my issues and that was all that really mattered to me.
"
Recommended by93%of homeowners
Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Haileyville, OK and surrounding areas

In business since 1947

Free estimates

"It was great, I'm looking at it now, it's gorgeous. The people who built it were fabulous. In terms of pricing, he was near the bottom of some of the others. He wasn’t the lowest, but he was near the bottom. In terms of the quality of the product, I couldn’t be happier. I love the quality. I would absolutely recommend them. They did a really nice job. In fact, whilst it was near the cheapest, nothing was skimped."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
...
Showing 1-10 of 62
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Haileyville, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.