Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Hobart, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Hobart, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Hobart

PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Hobart, OK and surrounding areas

In business since 2002

Credit card accepted

"Company owners showed up at the agreed date and time.  They did a thorough walk around, asked what seemed to me to be the appropriate questions, and gave me an estimate on the spot.  They told me I would be contacted by their scheduler to arrange for the work crew to come do the work.  They thoroughly explained the process to be used and the precautions that would be taken to protect my property.
 A couple of days later the scheduler called to ask if their crew could come in a couple of hours since they had finished another job earlier than expected.  The crew did its work in about two hours completely to my satisfaction.  They did a good job of cleaning up the fairly small mess they had made and I am extremely satisfied with their work.
"
Recommended by93%of homeowners
Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Hobart, OK and surrounding areas

In business since 1947

Free estimates

"The services performed resulted in a very beautiful and functional game room area.  My wife and I are very pleased with the work.  Roger, his primary employee, Dave, and all of the sub contractors he used were outstanding.  For example, the texture blends and paint matches were exceptional.  The travertine floor is perfect.  Cabinets were of of good quality and as ordered.  The carpet was modified and replaced for a nice cost savings.  Our new room appears that it was always configured in its current state. Roger was very accessible, genuinely attempted to address all of our requests and was very easy to work with."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
...
Showing 1-10 of 60
Asphalt Driveways questions, answered by experts

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

The Hobart, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.