Top-rated asphalt driveway pros.

Best asphalt driveway pros near Grandfield, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Grandfield, OK?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Grandfield - Updated Nov 2026

Avatar for Smith Sand & Gravel
Smith Sand & Gravel
New to Angi
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Grandfield, OK and surrounding areas

Approved

Smith Sand and Gravel has proudly served Blanchard, Oklahoma and surrounding communities for over 10 years. Based in Blanchard, OK, we provide reliable services within a 100-mile radius.\nOur team operates two skid loaders equipped with multiple attachments, allowing us to handle a wide range of projects efficiently and safely. For specialized jobs, we have the capability to rent additional equipment as needed to ensure the job is completed correctly and on schedule.\nWe are a hardworking, dependable crew committed to going above and beyond for every client. Our focus is quality workmanship, timely completion, and customer satisfaction.

Residential Projects
Residential Projects
Residential Projects
Residential Projects
Residential Projects

+5

...
Showing 1-10 of 64
Asphalt Driveways FAQs, answered by experts

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt paving offers several benefits, including cost-effectiveness and a quick installation process. It provides a durable and smooth surface, making it ideal for high-traffic areas. With proper maintenance, asphalt also offers longevity.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The Grandfield, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.