Top-rated remodel designers.

Best remodel designers near Covington, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your remodel design project in Covington, OK?

Select your specific project to find the pro for you.

Top-Rated Remodel designers in Covington - Updated Nov 2026

Avatar for Ortiz Custom Remodeling LLC
Ortiz Custom Remodeling LLC
4.1(
10
)
Bathroom - RemodelBasement - RemodelDesigner - Kitchen+2 more

Serving Covington, OK and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Antonio had his crew working at my home for 4 days. They were on time and Antonio inspected their work daily. Ortiz Custom Remodeling corrected the work on all my doors from an individual I hired prior. They did an excellent job. They had to cut out my bedroom door frame to install a 32" steel door and did that in an hour. I was amazed how quickly they installed it! They sanded, kilz and painted 6 interior doors, three double closet doors and one steel door. They removed the tri fold closest doors and framed in the double closet doors. All my doors fit perfectly and are beautiful. I'm so happy and plan to hire them again for my upcoming home improvement projects. They are awesome! I'm extremely grateful to all of them for their professionalism and kindness. I thank God that ANGi helped me find them. Ortiz stands above the rest of the companies and were also cheaper on the cost."
Kitchen cabinets
Kitchen Remodel
Kitchen Remodel
Countertop
Kitchen Remodel

+12

Response time8 hrs
2 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for APEX Drafting LLC
APEX Drafting LLC
3.5(
8
)
Designer - Building

Serving Covington, OK and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience. \nYou will find us to be competitively priced with close attention to the details. \nOur reputation is based on service, safety, and quality, regardless of how large or small the job. \nWe look forward to building a lasting relationship and guarantee your satisfaction! \n

Plan set 1
259 neighbors recently requested a quote
Avatar for 1935 Construction
1935 Construction
New to Angi
Basement - RemodelBathroom - RemodelDesigner - Building+3 more

Serving Covington, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Introducing 1935 Construction Group (1935 CG)\n\nAt 1935 Construction Group, we believe every great project starts with a vision and is brought to life through quality craftsmanship, dedication, and attention to detail.\n\nWe specialize in commercial and residential construction, renovations, remodeling, and property improvements, helping business owners, investors, and homeowners transform their spaces.\n\nFrom restaurant and bar build-outs to commercial renovations and residential improvements, our goal is to deliver reliable service, quality workmanship, and results that exceed expectations.\n\nWhether you’re launching a new business, renovating an existing property, or bringing a new development to life, 1935 CG is committed to building lasting relationships and delivering projects you can be proud of.\n\n1935 Construction Group\nBuilding Vision. Creating Value. Delivering Excellence.\n\nLet’s build something great together.

2 neighbors recently requested a quote
...
Showing 1-10 of 102
Remodel Design FAQs, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

In-law suite floor plans almost always include at least one bedroom, a bathroom, and a combination kitchen/living room area or separate spaces for the kitchen and living room. Larger in-law suites built in accessory dwelling units separate from your main structure can feature multiple bedrooms, dining rooms, and entertainment rooms in addition to the necessities.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

The Covington, OK homeowners’ guide to remodel design services

From average costs to expert advice, get all the answers you need to get your job done.