Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Orange, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Orange, OH?

Select your specific project to find the pro for you.

TRUSTED BY ORANGE, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon113
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Orange

Avatar for MELS POOL PROS LLC
MELS POOL PROS LLC
4.9(
109
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have Materials

Serving Orange, OH and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"Chris and Matt installed a water filtration, conditioner, and uv light system for us. They were prompt, knowledgeable and professional. They inadvertently broke a part of the uv filter at the first visit, which they ordered and replaced as soon as possible at their expense. Whenever we had questions about the system, Chris took the time to answer them. We highly recommend them!"
Response time5 hrs
Response rate91%
4 neighbors recently requested a quote
Avatar for Prestige Pool Care
Prestige Pool Care
4.8(
61
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Orange, OH and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"Nick called right away and was very professional. He went above and beyond my expectations. My pool was green and full of algae. He turned it around in a few days and was finished in time for my son's graduation party. He was very responsive and I would recommend him to anyone."
AFTER
BEFORE
Drain+Chlorine Rinse
Filter Clean
After

+5

80 neighbors recently requested a quote
Recommended by58%of homeowners
Avatar for Triple A Pool Service LLC
Triple A Pool Service LLC
4.4(
20
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Orange, OH and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Despite the fact that it was cold and raining, Colleen and Abby spent over 2 hours opening my pool and did a fantastic job. This is the 4th season opening our pool and the previous company was in and out whereas Colleen and Abby took the time to make sure everything was done properly and in my opinion they went above and beyond what I expected to be done. They were on time and professional and I will continue to use Triple A for all future openings and closings. I would highly recommend this company."
Recommended by94%of homeowners
Avatar for B & T Excavating
B & T Excavating
4.4(
11
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Orange, OH and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"B&T did a great job on my yard drainage project. My yard was a swamp! They came in and installed a drainage system that is not linked to my gutter downspout. Working very well! It's hard to find a company that knows and understands this type of project. Great job, B&T!"
Response time2 days
Recommended by88%of homeowners
Showing 1-10 of 16
Install Above Ground Pools questions, answered by experts

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

Finding a reputable inground pool installation company starts with an online search and assessing a company’s positive and negative reviews. You can also check the Better Business Bureau’s reports for companies you’re considering to see if they have numerous customer complaints for poor service. One of the best things you can do to find a good company is ask for references and then call those past customers to see how they felt during the installation process and how their pool has held up. Finally, you can get estimates from the remaining companies to compare.

There are some disadvantages to a salt water pool. Besides costing slightly more than chlorine pools, salt water pools require a lot of salt. It's also harder to find a professional with salt water pool experience to do minor maintenance and repairs. Salt water can also damage some materials, so you’ll need to use specific heating, fixtures, lighting, liners, and masonry when building a salt water pool.

A pool chiller will take anywhere from 12 to 14 hours to lower your pool's temperature by 1 to 15 degrees. Most people tend to run their coolers overnight, but larger pools in warm climates take longer to cool. Choosing a chiller with the right capacity can help speed up the process.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Orange, OH homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.