Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Newport, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Newport, OH?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Newport

Avatar for B&G Elite Concrete
B&G Elite Concrete
5.0(
6
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Newport, OH and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"I needed a concrete slab poured and finished with short notice and specific needs. B&G answered the call and out performed all of my expectations. The finish on the concrete floor in particular was impressive to say the least. I couldn’t be happier with the finished product and the professionalism exhibited during the process was a breath of fresh air —pleasant, honest, confident and personable. Experiences like this renew my faith in America. Thank you Bobby, Glenn and crew."
Stamped patio
Custom stamped back patio
Concrete - Stamped & Decorative Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project

+39

Response rate100%
4 neighbors recently requested a quote
Recommended by83%of homeowners
Miller Concrete & Construction
5.0(
1
)
Concrete Driveways & Floors - Install- For Business

Serving Newport, OH and surrounding areas

Approved

In business since 2005

Free estimates

Offers commercial services

Miller Concrete & Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

...
Showing 1-10 of 121
Asphalt Driveways questions, answered by experts

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Newport, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.