Top-rated asphalt driveway pros.

Best asphalt driveway pros near New Washington, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in New Washington, OH?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in New Washington - Updated Nov 2026

Avatar for Reliable Concrete Services LLC
Reliable Concrete Services LLC
4.7(
16
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving New Washington, OH and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"Armondo and his crew replaced two landscaped areas in and around the driveway with concrete. We are extremely pleased with their work and the result. It is exactly what we wanted. If we ever need concrete again we will be calling them."
Prep
Finished slab
Finished slab
Prep
Old cracked concrete

+141

Response time1 day
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Mud Dawg Concrete
Mud Dawg Concrete
4.9(
7
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving New Washington, OH and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"We had our driveway poured and couldn?t be happier with how it turned out! The entire process was smooth from start to finish. The crew was professional, hardworking, and paid great attention to detail. They did an amazing job, cleaned everything up when they were finished, and the driveway looks fantastic. We highly recommend them to anyone looking to have a driveway poured. Great work, great service, and a beautiful finished product!"
Logo
Driveway
Front Porch
Driveway
Stamped Patio

+2

6 neighbors recently requested a quote
Avatar for Hemenway Land Enhancement
Hemenway Land Enhancement
5.0(
2
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving New Washington, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Shane and his crew went above and beyond to completely exceed our expectations not only in getting our concrete job and driveway work done in a very timely manner...but also in taking the extra time to really finish the job with a decorative texture that looks amazing and will last a long time. We highly recommend Shane Hemenway and his crew for your home concrete work."
Front Yard
4 neighbors recently requested a quote
...
Showing 1-10 of 98
Asphalt Driveways FAQs, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The New Washington, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.