Top-rated asphalt driveway pros.

Best asphalt driveway pros near Attica, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Attica, OH?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Attica - Updated Nov 2026

Avatar for Reliable Concrete Services LLC
Reliable Concrete Services LLC
4.7(
16
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving Attica, OH and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"Armondo and his crew replaced two landscaped areas in and around the driveway with concrete. We are extremely pleased with their work and the result. It is exactly what we wanted. If we ever need concrete again we will be calling them."
Prep
Finished slab
Finished slab
Prep
Old cracked concrete

+141

Response time1 day
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Hemenway Land Enhancement
Hemenway Land Enhancement
5.0(
2
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Attica, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Shane and his crew went above and beyond to completely exceed our expectations not only in getting our concrete job and driveway work done in a very timely manner...but also in taking the extra time to really finish the job with a decorative texture that looks amazing and will last a long time. We highly recommend Shane Hemenway and his crew for your home concrete work."
Front Yard
4 neighbors recently requested a quote
...
Showing 1-10 of 96
Asphalt Driveways FAQs, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt edging secures the sides of your driveway to prevent crumbling and cracking over time. Most driveways have edges with a 45-degree grading. This helps transfer some of the stress from the asphalt to the ground underneath. If your driveway doesn’t have proper edging, the pressure from your car may break down the edges over time.

When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:

  • How many years of experience do you have?

  • Are you licensed, bonded, and insured?

  • Do you have worker’s compensation?

  • Do you use subcontractors on your projects?

  • Do you clean up after the job is done?

  • Who is responsible for any damage to lawn or landscaping?

  • Do you provide a guarantee or warranty on your work?

  • Do you give free estimates?

  • What is the timeline for completion?

  • How do you handle change orders?

  • Can you provide at least three references?

  • Can I see some of the work you’ve done?

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Attica, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.