Top-rated basement remodelers.

Best basement remodelers near Fremont, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Fremont, OH?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Fremont - Updated Nov 2026

Avatar for CSG Specialty Fabrication
CSG Specialty Fabrication
5.0(
22
)
Basement - Remodel

Serving Fremont, OH and surrounding areas

Approved

In business since 1997

Free estimates

Credit card accepted

"They came to work when they said they were and stayed until the job was finished. They were pleasant, courteous, professional and cleaned up all leftover debris. I am so pleased with my finished product."
Front Porch
Front Porch
Pergola Remodel
Pergola Remodel
Pergola Remodel

+47

Response time1 day
4 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Gorney Builders
Gorney Builders
0.5(
1
)
Basement - Remodel

Serving Fremont, OH and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

We are a locally owned and operated company that values honesty and integrity, and treats your home as if it were our own. We offer a variety of services that are customization to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships, and guarantee your satisfaction! \n

Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement
Roof Replacement

+48

Response time8 hrs
Response rate100%
6 neighbors recently requested a quote
G L Construction Management
4.7(
3
)
Basement - Remodel

Serving Fremont, OH and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"G L Construction Management was such a great company to work with! I had numerous services completed by them in many rooms of my home. Very professional and friendly company. I wanted several things done before I moved into my new home and they worked very quickly to get me and my child settled in before Chrismas. I would recommend them for any household construction needs."
Garage / Shed Build Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project

+23

Recommended by100%of homeowners
Showing 1-10 of 47
Basement Remodel FAQs, answered by experts

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Fremont, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.