Top-rated siding pros.

Get matched with top siding pros in Long Beach, NY

Enter your zip and get matched with up to 5 pros

TRUSTED BY LONG BEACH, NY HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon248
    Verified siding services reviews

Find Siding pros in Long Beach

Avatar for Stars and Stripes Home Improvement LLC
Stars and Stripes Home Improvement LLC
4.8(
318
)

Serving Long Beach, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2017

Free estimates

Emergency services offered

"Very happy with the quality, timing and price. Good communication as well. The old roof had to be removed from both the main house and detached garage. The house had multiple layers of shingles that needed to come off and the garage also had the original cedar shingles in addition to the many layers of asphalt shingles. It was very messy getting the old roof off but the crew was really good about cleaning up. At the end of the first day the yard was a clean as it was before the work started. The entire job took only two days and the crew was able to start work the same week I signed the contract. Because less plywood was used than was quoted, the final price was even a few bucks less than the contracted price I agreed to. So overall I am very happy. Was a really smooth and easy project compared to past home projects."
Remodeling - Kitchen & Bathroom Project
VEGA KITCHEN
Painting - Interior Project
Complete Renovation
Basement

+716

Response time3 days
9 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Royal Roofing & Siding Brooklyn
Royal Roofing & Siding Brooklyn
4.6(
139
)

Serving Long Beach, NY and surrounding areas

Approved

Super Service Award Winner

In business since 1993

Free estimates

Emergency services offered

"Royal Roofing & Siding recently replaced my shingle roof, and the experience was excellent from start to finish. The crew was punctual, professional, and worked efficiently while keeping the property clean throughout the project. They answered all of my questions, used quality materials, and made sure every detail was completed correctly. The new roof looks fantastic, and I feel much more confident knowing my home is protected. I would definitely recommend Royal Roofing & Siding to anyone looking for reliable roofing services."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+41

Response time1 day
Response rate93%
18 neighbors recently requested a quote
Avatar for Pinnacle Roofing 786
Pinnacle Roofing 786
5.0(
19
)

Serving Long Beach, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"I would like to thank Omar and his crew for the excellent job they did replacing the missing siding on my house at a very reasonable price. Thanks again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+39

Response time9 hrs
5 neighbors recently requested a quote
Recommended by61%of homeowners
Avatar for Classic Remodeling Group Inc
Classic Remodeling Group Inc
4.7(
70
)

Serving Long Beach, NY and surrounding areas

Approved

In business since 1947

Free estimates

Warranties offered

"John and crew did an excellent job on my siding, roof , shutters and sliding door. They were very professional and very efficient. Definitely a happy customer!"
25 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Brothers Aluminum Corp
Brothers Aluminum Corp
4.4(
202
)

Serving Long Beach, NY and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"Everything about Brothers Aluminum far exceeded our expectations. They were simply excellent from start to finish - great service, quality, professionalism, pricing. They are some of the nicest, most professional, personable and customer-focused company's we've ever hired. We're so happy we selected them to handle our window and siding project. They replaced 27 windows and 5 patio doors and removed and replaced all of our siding and gutters. Teddy, the CEO, came to discuss the project with us on a few occasions, helped us make the right choices in terms of window models/styles and siding types, laid out everything as far timing, costs, financing options, etc. and were a delight to work with throughout the entirety of the project. They executed each phase of the project flawlessly, coordinated deliveries, communicated every step of the way, and conducted everything on time and on budget as promised. Their crews - both the window crew led by Gino; and their siding crew led by Manuel - were some of the best crews I've ever had work in/on our home. They showed up on time every day, were supremely competent in their duties, maintained a clean job site and were a delight to be around. Brothers Aluminum is the only option you should be considering for your home improvement needs. They were so wonderful to work with, I wish I had more work to give them. We're 1000% satisfied and am sure you will be too."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Response time1 day
7 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Undaunted Restoration, Inc.
Undaunted Restoration, Inc.
4.9(
127
)

Serving Long Beach, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"Undaunted removed asbestos siding and contracted to install new siding thereafter. The entire process took a week. The crews were unfailingly professional and attentive, offering to install a light fixture and repair a porch post free of charge. Excellent company."
Response time1 day
Response rate89%
69 neighbors recently requested a quote
Avatar for Premium Roofing & Siding, Inc.
Premium Roofing & Siding, Inc.
4.4(
191
)

Serving Long Beach, NY and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Excellent job in repairing cedar shingle siding. The work was completed quickly and extremely professionally. I was very pleased with the quality of the work and the attention they placed on every detail. Would happily call them for any future work."
chimney LEAD flashing
chimney flashing
repair
repair
repair

+106

Response time9 hrs
2 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Selective Remodeling
Selective Remodeling
4.6(
98
)

Serving Long Beach, NY and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"With me, it’s not just about the job, it’s about how these guys made me feel. I feel important to them, respected and a priority. I feel as if they are interested in my daily opinion. They want to please me as a customer. They respect my feelings, my suggestions and opinions. From start to where we are now, I am ahead of schedule on the kitchen. They are here when they say they will be here. They understand I am living out of the garage and dining room. They respect that I have a child who has needs while they are here. They stay past 5pm until the work is done. They check up on my progress daily. Mike and Dominick come to see the work often. I can trust their workers with my house/property when I am not home. I can go to work and not worry about what’s happening with my house. I also don’t have to pay all at once. They broke up the entire amount into percentages so I pay as we go through the weeks. They schedule all the work/specialists so I don’t have lag time or issues getting steps completed. They make sure my job is up to code. And most importantly, they clean up before they leave, inside and outside. I can’t tell you how important that is with a child and a cat. I don’t have to worry about him getting into the tools or garbage. I also trust that they will do what it takes to keep me satisfied as a customer. They listen to my concerns/comments as you can see each day whether at my home or over text (my preferred method of communication). They came up with a timeline that was loose so we could tweak plans when necessary and so I could plan my life around the renovations. I am pleased at the progress made so far and look forward to using my new kitchen! See what's gone on below! WORK SCHEDULE SO FAR July 17, 2016, Monday 6:45am Dumpster arrives July 18, 2016, Tuesday 8am the crew of 5 men arrived. The put plastic up around the back room and doors so the sawdust would be contained. They had the entire kitchen demolished by 3pm. The dumpster was filled. They vacuumed and left. What was planned for 2 days took 1. July 19, 2016, Wednesday Electricians and Plumbers came 8am. They found some areas not up to code and fixed the problems. Left at 4pm. I believe Mike arranged to have the specialists come at close times. It seemed when one left, someone else pulled up 30 seconds later. Talk about SERVICE! HVAC came at 4:45pm to look at what items would be needed and promised to see me the next morning. I was amazed so much got accomplished in such a short time. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. I gave him another check after he reviewed some of the financials with me. He makes it easy to not have to have all funds upfront. I feel more comfortable with this way. He plans it in percentages. Sometimes there are additional expenses such as more electrical work than was planned/billed for so that was an addition but these things are expected. I am trying to go with the flow. Changes happen. July 20, 2016, Thursday HVAC Mike came at 7am so that the wall guys would not have him in the way. We decided together to move two vents from the floors to the walls. He updated the heating vents and spent 3 hours making it to code. Walls went up as HVAC Mike worked. Ceilings were put up and 2 coats of Spackling. James, Jorge and Freddy did a terrific job. Neat, fast and looked great. I was very pleased with the work. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. Framing and Sheet rocking was planned for 4 days. It took 2. We were ahead of schedule. July 21, 2016, Friday James did a third coating of Spackle. He painted a first coat of my Soft Fern green color and the ceiling white. Dominick came by to check on the work/progress and see how we were doing. James vacuumed and cleaned up before he left. My husband found some areas he wanted addressed and I texted his concerns to Dominick. Dominick shared it with Mike. I didn’t want to bother Mike since it was the weekend, but Dominick felt our concerns were important. They were addressed Saturday morning. July 22, 2016, Saturday 8:30am. Eddie and Javier arrived to work on the floors. They nailed down the wire mesh which was a job that took all day. Tile needed to be cut as well. They left the place clean and neat. July 23, 2016, Sunday DAY OF REST July 24, 2016, Monday 8:45am. Eddie and Javier needed to mud the floors to make them level which they were not. One side needed to be higher than the other. Eddie and Javier worked very hard and left at 7pm after they cleaned up. It was a very long day for them. Mike made arrangements with the appliance store to deliver on August 1. July 25, 2016, Tuesday 8:45am. Eddie measured and laid the time on the leveled floors. It was a terribly hot day and Javier had to lug cement and cut tile in the heat. I felt so bad for him. He never complained and worked so very hard. The floors looked great but Eddie felt like it was not looking right so he lifted three rows of tile and did them again to get it right. He felt he wanted perfection and I appreciated that. I complimented him and shared that with Mike when he came to see the progress. They left at 5:30pm and planned to come back for the Backsplash when it was time. 4 days were planned to do the job. It took 3. July 26, 2016, Wednesday Freddy and Jorge came to work on making saddles and putting up molding around the doors and window. Freddy was so funny. He kept cleaning and I told him to not worry about the dust on the doors, that I would take care of it later. He was so concerned about keeping the place clean for me. I told him it was impossible since there was so much cutting of wood. Jorge spoke to me about the saddles and I made suggestions. He asked my opinion and he made it to my specifications such as overlapping the saddle to the stair for safety. They cleaned up and I was pleased to find out we had several days off to have family time instead of having construction. July 27, 2016 Thursday Jorge and Freddy came to complete the saddles and woodwork. Once again, outstanding! I left them alone all day while I went to work. I had no worries. I also knew Mike stopped by often at the site to check on progress but I trusted them completely. July 28-31, 2016 REST August 1, 2016, Monday Cabinet specialists Anthony and Paul arrived. They worked from 8:45-5pm. They put cabinets up, cut and measured over and over. They said, "Measure three times, cut once." They were very nice, knowledgeable, spoke kindly to my son and had a smile and a kind word to me most often during the day. August 2, 2016, Tuesday Cabinet guys arrived at 8:45am. I went to work and when I came back most of the cabinets were up. Since the floor was 3 inches higher than anticipated, they called Scott at Selective Sculptures to order a smaller cabinet so they would not have to cut it. The cabinet would arrive Thursday. August 3, 2016, Wednesday I called Mike to tell him I am taking a day of rest. August 4, 2016, Thursday Cabinets are done! Paul and Anthony arrived at 8:30 and they were completed by 5pm. They vacuumed and touched up the cabinets. They put the shelves in for me and discussed how to care for my cabinets. They put up the crown molding and asked my opinion about where I wanted the handles to go on the cabinets. Mike came by to see how it was progressing, to get a check from me and to plan the coming week of work. He's planning on my refrigerator and stove going in and working on Monday. As you can guess I'm tired of washing dishes in my bathroom and am grateful it's going to happen so quickly!"
Towers Renovations
Beier Bathroom
Deleon Kitchen
Deleon Master Bathroom
Deleon Master Bathroom

+279

Response time3 days
4 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Four Seasons Roofing
Four Seasons Roofing
4.6(
150
)

Serving Long Beach, NY and surrounding areas

Approved

In business since 1983

Free estimates

Emergency services offered

"We hired Four Seasons to redo our 30+ year old siding, which included our 3 story home and detached garage. In addition, we had them repair our roof and fix our foundation in the back of our home. This became a massive undertaking and we are so completely thrilled we choose them. We asked for job references and spoke with 4 different home owners who had nothing but amazing things to say about them. We compared their work to another larger company, and Four Seasons was out of the park; their level of detail was completely unmatched. Each home was literally picture perfect. If you’re hesitating – don’t! They are well worth the investment. From day one until the date of completion, Oscar listened to every single request and concern and continued to go above and beyond. We are so thankful we had him to work with from start to finish – we don’t believe anyone else would have taken the time out of their day to listen and give us exactly what we wanted (and then some). He is so honest and patient, which makes him such a pleasure to work with. Our foreman, Caesar and his entire team are so extremely skilled at their trade; the level of detail is unmatched. Our project was extremely detailed and time consuming and they were so very precise and thorough. We now have the home of our dreams – thank you Donna, Oscar, Caesar and everyone else for going above and beyond!"
GAF Preferred Contractor Badge
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Response time2 days
7 neighbors recently requested a quote
Recommended by96%of homeowners
...
Showing 1-10 of 421
Siding questions, answered by experts

Siding pros typically charge by the square foot when providing estimates for siding projects. They’ll take the material cost and add in an estimated labor fee, and some contractors will include an additional upcharge to account for profit, waste, and unexpected issues. Another important price factor your pro will consider is the quality of your home’s current siding, which they’ll need to remove, and your home’s sheathing. If pros have to make any additional repairs to your home’s exterior, the added labor will also influence your final siding cost.

While vinyl is the less expensive option, composite siding has been known to be more durable than vinyl. In addition, because it is made from recycled materials, it is a more ecologically-friendly choice. Composite siding is also more luxurious looking and comes in a much wider range of styles and colors.

While bleach can be effective in killing mold, it may not fully remove mold stains from siding. Additionally, bleach can be harsh and may damage certain types of siding. It's recommended to use specialized mold cleaners or natural alternatives that are safe for your specific siding material as a part of your regular siding maintenance

The best type of paint for vinyl siding is a high-quality acrylic latex paint, often labeled as '100% acrylic.' This type of paint is lightweight and adheres well to the vinyl surface, which reduces the likelihood of it peeling or flaking. For best results, apply two coats and avoid using thick paint. The color choice is also important; select a light color to prevent the paint from absorbing excess heat, which helps extend the durability of your paint job.

Some homeowners use caulk on the edges of clapboard siding to help seal it. However, this method invites new problems. With so many gaps sealed, clapboard siding is often unable to drain properly and moisture from rain or other sources can build up inside. This can lead to rot and other issues over time. When repairing clapboards, it’s best to avoid caulking the final product. The exception is trim around windows and doors, which should be caulked to avoid moisture problems.

The Long Beach, NY homeowners’ guide to siding services

From average costs to expert advice, get all the answers you need to get your job done.