Top-rated siding pros.

Get matched with top siding pros in Franklin Square, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your siding service project in Franklin Square, NY?

Select your specific project to find the pro for you.

TRUSTED BY FRANKLIN SQUARE, NY HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon339
    Verified siding services reviews

Find Siding pros in Franklin Square

Avatar for Brothers Aluminum Corp
Brothers Aluminum Corp
4.4(
203
)
Vinyl Siding - Install or Completely ReplaceWood or Fiber-Cement Siding - Install or Completely Replace

Serving Franklin Square, NY and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"Everything about Brothers Aluminum far exceeded our expectations. They were simply excellent from start to finish - great service, quality, professionalism, pricing. They are some of the nicest, most professional, personable and customer-focused company's we've ever hired. We're so happy we selected them to handle our window and siding project. They replaced 27 windows and 5 patio doors and removed and replaced all of our siding and gutters. Teddy, the CEO, came to discuss the project with us on a few occasions, helped us make the right choices in terms of window models/styles and siding types, laid out everything as far timing, costs, financing options, etc. and were a delight to work with throughout the entirety of the project. They executed each phase of the project flawlessly, coordinated deliveries, communicated every step of the way, and conducted everything on time and on budget as promised. Their crews - both the window crew led by Gino; and their siding crew led by Manuel - were some of the best crews I've ever had work in/on our home. They showed up on time every day, were supremely competent in their duties, maintained a clean job site and were a delight to be around. Brothers Aluminum is the only option you should be considering for your home improvement needs. They were so wonderful to work with, I wish I had more work to give them. We're 1000% satisfied and am sure you will be too."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Response time1 day
13 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Undaunted Restoration, Inc.
Undaunted Restoration, Inc.
4.9(
127
)
Asbestos Siding - Repair

Serving Franklin Square, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"Undaunted removed asbestos siding and contracted to install new siding thereafter. The entire process took a week. The crews were unfailingly professional and attentive, offering to install a light fixture and repair a porch post free of charge. Excellent company."
Response time1 day
Response rate90%
59 neighbors recently requested a quote
Avatar for Premium Roofing & Siding, Inc.
Premium Roofing & Siding, Inc.
4.4(
191
)
Vinyl Siding - Repair or Partially ReplaceWood or Fiber-Cement Siding - Repair or Partially Replace

Serving Franklin Square, NY and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Excellent job in repairing cedar shingle siding. The work was completed quickly and extremely professionally. I was very pleased with the quality of the work and the attention they placed on every detail. Would happily call them for any future work."
chimney LEAD flashing
chimney flashing
repair
repair
repair

+106

Response time9 hrs
1 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Selective Remodeling
Selective Remodeling
4.6(
98
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially Replace+4 more

Serving Franklin Square, NY and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"With me, it’s not just about the job, it’s about how these guys made me feel. I feel important to them, respected and a priority. I feel as if they are interested in my daily opinion. They want to please me as a customer. They respect my feelings, my suggestions and opinions. From start to where we are now, I am ahead of schedule on the kitchen. They are here when they say they will be here. They understand I am living out of the garage and dining room. They respect that I have a child who has needs while they are here. They stay past 5pm until the work is done. They check up on my progress daily. Mike and Dominick come to see the work often. I can trust their workers with my house/property when I am not home. I can go to work and not worry about what’s happening with my house. I also don’t have to pay all at once. They broke up the entire amount into percentages so I pay as we go through the weeks. They schedule all the work/specialists so I don’t have lag time or issues getting steps completed. They make sure my job is up to code. And most importantly, they clean up before they leave, inside and outside. I can’t tell you how important that is with a child and a cat. I don’t have to worry about him getting into the tools or garbage. I also trust that they will do what it takes to keep me satisfied as a customer. They listen to my concerns/comments as you can see each day whether at my home or over text (my preferred method of communication). They came up with a timeline that was loose so we could tweak plans when necessary and so I could plan my life around the renovations. I am pleased at the progress made so far and look forward to using my new kitchen! See what's gone on below! WORK SCHEDULE SO FAR July 17, 2016, Monday 6:45am Dumpster arrives July 18, 2016, Tuesday 8am the crew of 5 men arrived. The put plastic up around the back room and doors so the sawdust would be contained. They had the entire kitchen demolished by 3pm. The dumpster was filled. They vacuumed and left. What was planned for 2 days took 1. July 19, 2016, Wednesday Electricians and Plumbers came 8am. They found some areas not up to code and fixed the problems. Left at 4pm. I believe Mike arranged to have the specialists come at close times. It seemed when one left, someone else pulled up 30 seconds later. Talk about SERVICE! HVAC came at 4:45pm to look at what items would be needed and promised to see me the next morning. I was amazed so much got accomplished in such a short time. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. I gave him another check after he reviewed some of the financials with me. He makes it easy to not have to have all funds upfront. I feel more comfortable with this way. He plans it in percentages. Sometimes there are additional expenses such as more electrical work than was planned/billed for so that was an addition but these things are expected. I am trying to go with the flow. Changes happen. July 20, 2016, Thursday HVAC Mike came at 7am so that the wall guys would not have him in the way. We decided together to move two vents from the floors to the walls. He updated the heating vents and spent 3 hours making it to code. Walls went up as HVAC Mike worked. Ceilings were put up and 2 coats of Spackling. James, Jorge and Freddy did a terrific job. Neat, fast and looked great. I was very pleased with the work. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. Framing and Sheet rocking was planned for 4 days. It took 2. We were ahead of schedule. July 21, 2016, Friday James did a third coating of Spackle. He painted a first coat of my Soft Fern green color and the ceiling white. Dominick came by to check on the work/progress and see how we were doing. James vacuumed and cleaned up before he left. My husband found some areas he wanted addressed and I texted his concerns to Dominick. Dominick shared it with Mike. I didn’t want to bother Mike since it was the weekend, but Dominick felt our concerns were important. They were addressed Saturday morning. July 22, 2016, Saturday 8:30am. Eddie and Javier arrived to work on the floors. They nailed down the wire mesh which was a job that took all day. Tile needed to be cut as well. They left the place clean and neat. July 23, 2016, Sunday DAY OF REST July 24, 2016, Monday 8:45am. Eddie and Javier needed to mud the floors to make them level which they were not. One side needed to be higher than the other. Eddie and Javier worked very hard and left at 7pm after they cleaned up. It was a very long day for them. Mike made arrangements with the appliance store to deliver on August 1. July 25, 2016, Tuesday 8:45am. Eddie measured and laid the time on the leveled floors. It was a terribly hot day and Javier had to lug cement and cut tile in the heat. I felt so bad for him. He never complained and worked so very hard. The floors looked great but Eddie felt like it was not looking right so he lifted three rows of tile and did them again to get it right. He felt he wanted perfection and I appreciated that. I complimented him and shared that with Mike when he came to see the progress. They left at 5:30pm and planned to come back for the Backsplash when it was time. 4 days were planned to do the job. It took 3. July 26, 2016, Wednesday Freddy and Jorge came to work on making saddles and putting up molding around the doors and window. Freddy was so funny. He kept cleaning and I told him to not worry about the dust on the doors, that I would take care of it later. He was so concerned about keeping the place clean for me. I told him it was impossible since there was so much cutting of wood. Jorge spoke to me about the saddles and I made suggestions. He asked my opinion and he made it to my specifications such as overlapping the saddle to the stair for safety. They cleaned up and I was pleased to find out we had several days off to have family time instead of having construction. July 27, 2016 Thursday Jorge and Freddy came to complete the saddles and woodwork. Once again, outstanding! I left them alone all day while I went to work. I had no worries. I also knew Mike stopped by often at the site to check on progress but I trusted them completely. July 28-31, 2016 REST August 1, 2016, Monday Cabinet specialists Anthony and Paul arrived. They worked from 8:45-5pm. They put cabinets up, cut and measured over and over. They said, "Measure three times, cut once." They were very nice, knowledgeable, spoke kindly to my son and had a smile and a kind word to me most often during the day. August 2, 2016, Tuesday Cabinet guys arrived at 8:45am. I went to work and when I came back most of the cabinets were up. Since the floor was 3 inches higher than anticipated, they called Scott at Selective Sculptures to order a smaller cabinet so they would not have to cut it. The cabinet would arrive Thursday. August 3, 2016, Wednesday I called Mike to tell him I am taking a day of rest. August 4, 2016, Thursday Cabinets are done! Paul and Anthony arrived at 8:30 and they were completed by 5pm. They vacuumed and touched up the cabinets. They put the shelves in for me and discussed how to care for my cabinets. They put up the crown molding and asked my opinion about where I wanted the handles to go on the cabinets. Mike came by to see how it was progressing, to get a check from me and to plan the coming week of work. He's planning on my refrigerator and stove going in and working on Monday. As you can guess I'm tired of washing dishes in my bathroom and am grateful it's going to happen so quickly!"
Towers Renovations
Beier Bathroom
Deleon Kitchen
Deleon Master Bathroom
Deleon Master Bathroom

+279

Response time3 days
Response rate100%
4 neighbors recently requested a quote
Avatar for Four Seasons Roofing
Four Seasons Roofing
4.6(
150
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially Replace+4 more

Serving Franklin Square, NY and surrounding areas

Approved

In business since 1983

Free estimates

Emergency services offered

"Loved working with this company. Very happy with the quality of their work and professionalism-- from the girls in the office to the crew they sent to replace my parent's roof, the entire job was seamless. They were prompt, courteous, cleaned up our yard meticulously which is really great. Even though we had this done a few years ago, had to write a review because the roof came out great and still looks brand new. I would recommend them highly. Just as a side note, these guys have been in business for over 3 decades and have won so many awards... not everyone is GAF certified with Master Elite status, but they are. Check them out, we're very fussy and do our homework before we hire someone for something as important as a roof, and so glad we chose them to do the work. Job well done!"
GAF Preferred Contractor Badge
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Response time2 days
Response rate100%
11 neighbors recently requested a quote
...
Showing 1-10 of 496
Siding questions, answered by experts

The clapboard exposure, also called the reveal, refers to the amount of clapboard visible in the siding. Clapboards always overlap slightly, but some overlap more than others. The exposure is the vertical measurement of the board that remains visible as the clapboard is installed.

When repairing clapboard siding, it’s important that you match the exposure of your current clapboards. You may want to take a measurement of the specific exposure on your siding for reference in repairs.

Vinyl is the most common shingle siding due to its rigid PVC design, longevity, affordability, and ease of installation. The next most popular types of shingle siding are fiber cement, which is in the mid-range for prices, and cedar shake, which is the most expensive. Consider the upfront cost, ongoing maintenance costs, and durability in your specific climate before deciding.

Steel and aluminum are two types of metal siding that are commonly used for residential and commercial buildings, but the materials have specific differences. Typically, steel is heavier and sturdier, fending off scratches and dents, while aluminum is lightweight and more prone to damage. Cost is another differentiating factor, as steel is more expensive than aluminum siding cost.

You can put new siding over clapboards, but it’s not recommended. Some sidings, like vinyl siding, can go over clapboards with sheathing like a foam layer in between. However, it’s best to remove clapboard siding if you plan on replacing it with new siding. Burying wood clapboards underneath new siding can create risks of rot and mold, or hidden insect damage. It can also create warping issues over time. Removing clapboards allows you to properly install a new sheathing, as well as clean up the exterior wall and look for any signs of damage.

You should restain or refinish your home's cedar siding every three to seven years to maintain its appearance and ensure maximum protection. The precise frequency depends on several factors, including your local climate, the siding's exposure to severe weather like direct sunlight, rain, and wind, the quality of the initial stain application, the type of stain used, and the condition of the wood.

Homeowners in harsh climates with high humidity and significant direct sunlight should plan on restaining every three years, while those in milder locations can wait up to seven years. For the longest-lasting protection in particularly harsh environments, consider using an opaque stain.

If you're looking for a lower-maintenance alternative, vinyl or aluminum siding are options to consider. Although their installation cost may be higher, they don't require as much upkeep over time, which can provide more value, especially in areas with excessive rainfall or high humidity.

The Franklin Square, NY homeowners’ guide to siding services

From average costs to expert advice, get all the answers you need to get your job done.