Top-rated drywall pros.

Get matched with top drywall pros in Camden, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your drywall service project in Camden, NY?

Select your specific project to find the pro for you.

Find Drywall pros in Camden

Avatar for Callaghans Cleaning Company
Callaghans Cleaning Company
4.5(
10
)
Drywall - Repair

Serving Camden, NY and surrounding areas

Approved

In business since 2006

Free estimates

Offers commercial services

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Move out clean
Move out clean
Move out clean
Move out clean
Move out clean

+5

Response time1 day
45 neighbors recently requested a quote
...
Showing 1-10 of 76
Drywall questions, answered by experts

While not always necessary, you can glue a drywall ceiling in addition to using screws or nails. Drywall is typically secured to ceiling joists with fasteners, which is often sufficient. However, adding construction adhesive can offer benefits like preventing sagging, bridging gaps, and reducing air leaks for better energy efficiency. It may also be used for specific acoustic or insulation needs. On the other hand, many professionals advise against it because properly placed screws make the drywall structural, glue doesn't add strength, and it makes future repairs or replacements significantly more difficult. Ultimately, it's best to follow local building codes and project-specific requirements to decide if adhesive is right for your ceiling.

It doesn’t matter which way you lay drywall, and you can choose to install it horizontally or vertically depending on the size of the wall and how tall the ceiling is. It’s easier to lay drywall sheets vertically if you have a taller ceiling, but laying sheets horizontally makes it easier to apply joint compound.

You should leave a gap between drywall sheets because they naturally expand and contract along with the building framing as temperature and humidity change. Most pro drywall installers leave a gap of about ⅛ inch between drywall sheets, allowing the sheets to expand, contract, and shift without cracking or becoming damaged. If you don’t leave enough gaps between slabs, the edges will press against each other when they expand, and the pressure can cause visible cracks.

To hide drywall edges, you need to properly apply drywall tape and multiple layers of joint compound. These materials hide the seams between drywall sheets and fill the holes from drywall screws, leaving behind a smooth, flat finish to paint over. Apply joint compound smoothly, and finish the job by sanding the walls to make sure you fully hide drywall edges and other imperfections.

New plaster must be fully dry and cured before painting. The drying time for plaster ranges from 1 to 4 hours, but the curing process can take more than five days, depending on various factors, including humidity levels, temperature, the amount of plaster used, and airflow in the area. You should always apply primer before painting plaster.

The Camden, NY homeowners’ guide to drywall services

From average costs to expert advice, get all the answers you need to get your job done.