Top-rated paving pros.

Get matched with top paving pros in Albion, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Albion, NY?

Select your specific project to find the pro for you.

TRUSTED BY ALBION, NY HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon12
    Verified paving services reviews

Find Paving pros in Albion

Shepard Paving
New to Angi
Asphalt Paving - InstallAsphalt Paving - Repair or Patch

Serving Albion, NY and surrounding areas

In business since 1998

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n\n

Showing 1-10 of 28
Paving Services questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Installing a walkway to your home can add value, as it can make your landscaping look more intentionally designed and boost your overall curb appeal. In addition, walkways can be installed with accessibility in mind, which can be helpful for those with mobility issues or who need a wheelchair.

Depending on project size, typically 1 to 3 days, including preparation and installation.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

Although you could try to lay stepping stones directly over grass, which speeds up the installation process significantly, this method often leads to a poor result over time. Even heavy paver stones will eventually slide or shift on top of the grass. Digging into the ground and following the steps we listed is the best way to lay stepping stones for a long-lasting result.

The Albion, NY homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.