Top-rated basement remodelers.

Get matched with top basement remodelers in Gardnerville, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Gardnerville, NV?

Select your specific project to find the pro for you.

Find Basement remodelers in Gardnerville

J. Millett Construction Company
3.1(
51
)
Basement - Remodel

Serving Gardnerville, NV and surrounding areas

Approved

In business since 2003

Free estimates

Warranties offered

"I am so happy with the job J. Millett has done on our bathroom remodel. He has taken special attention to every detail I want to be just right. His crew has always shown up on time, they've been very courteous, and kept the work area and walking in an out of the house clean and protected from messes and debris. Everyone has been friendly and very knowledgeable at their job position. Everything happened in a timely manner and the end result is better than I imagined. I referred J. Millett to my parents for their future remodels and will continue to refer him to anyone I hear looking for a top notch contractor. I am beyond pleased with the job he has done. And he's such a great guy to top it off. Its been a joy working with him and his crew. My kids have enjoyed watching the guys working and they have all been great at explaining to my 5 year what and why they are doing it and what each tool is for. Remodels can be stressful, but my experience was anything but that. It was really great to see the end outcome, it turned out beautiful! And it was a joy working with Joe and his crew. I highly recommend J. Millett Construction."
Response time7 hrs
17 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Gardnerville, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Monge Construction
Monge Construction
5.0(
2
)
Basement - Remodel

Serving Gardnerville, NV and surrounding areas

In business since 1999

Free estimates

Our mission at Monge Construction is to continue the growth of our business by doing right by all of our clients. We love seeing that one of a kind smile on a home owners face at the end of a project! Monge Construction stacks up with the competition and surpasses it with competitive prices, second to none workmanship and a prompt/responsive team! We give you quality that you can measure, and a finished product that will enhance your home forever. Call us today!

Response time1 day
Recommended by100%of homeowners
Troy Pinney Custom Carpentry
4.2(
5
)
Basement - Remodel

Serving Gardnerville, NV and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Troy was on time to look at job. Spent time going over what he could do to help remodel a bathroom. He explained only the part of the job he could do and I would need to hire others to complete the total work being done such as a plumber and tile person. I was moving a shower, making it bigger, having it tiled and then a cabinet made for the old shower area. He had ideas about what to do and it made sense to us.
He was prompt and on time for meeting. He was a real nice guy and was coming from Carson to do the job in Reno.
Our main concern was that after this original visit, I got one call that he was busy and could not get the estimate done in a timely matter and that he would do it the following week.
I never got an estimate or even another phone call. It has been 3 months with no contact and I hired another person to do the job.
A phone call would have been better than nothing. By waiting for his call and no response to email it delayed my job by months.
"
Recommended by100%of homeowners
Showing 1-10 of 11
Basement Remodel questions, answered by experts

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Gardnerville, NV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.