Top-rated basement remodelers.

Best basement remodelers near Yerington, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Yerington, NV?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Yerington - Updated Nov 2026

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Yerington, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
BIG n Littles All Around Handyman Services
New to Angi
Basement - Remodel

Serving Yerington, NV and surrounding areas

In business since 2022

Free estimates

Emergency services offered

It can be a daunting task looking for only the right contractor for your job but also the right contractor for you. We completely understand what you're going through. We know every customer has different desires, different needs and different schedules. We're only here to turn your ideas into reality but to make it a memorable experience every step of the way. Call us right now, no matter where you are in the planning process.

Basement Remodel FAQs, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The Yerington, NV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.