Get matched with top subcontractors in Farmington, NM

Farmington homeowners rate subcontractors in our network

4.5

(269 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Farmington, NM?

Select your specific project to find the pro for you.

Find Subcontractors in Farmington

Babcock Construction
4.7(
41
)

Serving Farmington, NM and surrounding areas

Approved

In business since 1968

Free estimates

Credit card accepted

"Three generations of Babcocks are involved in this business and working with them was delightful. They responded promptly to our initial inquiry via Angie's List and quickly arranged some initial work so we could have a floor installed. They helped us design a new kitchen and built cabinets to fit it. They also built custom bookshelves for our library. Their work is first-rate. They were efficient and imaginative. Prices were fair and their subcontractors reliable. In short, they were the best contractors we have ever worked with."
Response time4 days
5 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Farmington, NM and surrounding areas

In business since 2006

Credit card accepted

"I assumed that this was an actual vs virtual consultation. When I contacted vendor, he explained that this was a virtual consultation. He also apologized and told me that there had been a fair amount of confusion among Angie's list customers on this point. Vendor was courteous and accommodating."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
SMRT Construction Services Inc.
3.3(
88
)

Serving Farmington, NM and surrounding areas

In business since 1984

Free estimates

Emergency services offered

"I wish that they had told me not to do it at all. They worked really hard, but they were not able to get it done. I did not know that it would cost so much to do the whole deck. It did not get the whole thing done. I was more preventative and they only did half of it. I did not know that it was going to take so long. I was only able to get half of it done, they did do what was said in the advertisement. I could not afford to have the rest of it done. It has been too difficult to deal with. I did pay for a couple of extra hours. They came out a couple of weeks after I made the purchase. The quality was good for what they were supposed to do."
Recommended by58%of homeowners
Showing 1-10 of 28
Subcontractors questions, answered by experts

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Farmington, NM homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.