Top-rated basement remodelers.

Get matched with top basement remodelers in Syracuse, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Syracuse, NE?

Select your specific project to find the pro for you.

Find Basement remodelers in Syracuse

Avatar for RMG REMODELING CONSTRUCTION LLC
RMG REMODELING CONSTRUCTION LLC
New to Angi
Basement - Remodel

Serving Syracuse, NE and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

I have spent the last four years remodeling and constructing new buildings, working for other companies such as Hausmann Construction and Samsung Construction—including on the renovation of the football stadium in Lincoln, Nebraska. I have carried out renovations of churches and schools, as well as basements, garages, bathrooms, and kitchens. Now, I have established my own company, and I am ready to apply all my expertise to grow my business.

Premier Home Solutions of Nebraska
5.0(
4
)
Basement - Remodel

Serving Syracuse, NE and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Top notch service! After extensive water damage to my bathroom, Brent and his crew came in and drafted a thorough plan to remodel project. Exceptional communication! Brent kept me informed of the progress verbally and visually with job photos. He evaluated all my remodeling suggestions professionally and provided tactful guidance on how to implement my suggestions or a better way forward with repairs. He was able to transform a small space 3/4 bathroom shared with a laundry room into a private 1/2 bathroom that greatly improved the overall use of the downstairs space of my home."
1/2 bath to 3/4 conversion
1/2 bath to 3/4 conversion
1/2 bath to 3/4 conversion
1/2 bath to 3/4 conversion
1/2 bath to 3/4 conversion

+8

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Syracuse, NE and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
CJC Construction LLC
4.2(
5
)
Basement - Remodel

Serving Syracuse, NE and surrounding areas

In business since 1999

Free estimates

is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Response time3 days
Recommended by50%of homeowners
Showing 1-10 of 25
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Yes, barndominiums can have basements. Barndominiums are typically built over concrete slabs, so barndo basements are not very common. However, it is possible to include a basement in a barndominium blueprint as long as you’re building completely from scratch. Barndos can have the same types of basements as traditional homes, including full or walk-out basements.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

The Syracuse, NE homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.