Install Above Ground Pools questions, answered by experts

The formula you’ll use to measure your pool will differ based on the shape of your pool. For a rectangular pool, you’ll use the following formula to find the size in gallons: length x width x depth x 7.5. If the depth changes from one end of your pool to the other, take the average by finding the depth at the deepest and most shallow points and dividing that number by two. Circular and oval pools require different, more complicated formulas, which can be found in this article.

The regulations for pool fence heights vary by state, so be sure to research what the legal, minimum height is in your area before purchasing or installing a fence. Though every region is different, generally a pool fence must be at least 4 and ½ feet high. If you’re unsure whether you need a fence around your pool, and how high that fence should be, contact a local pool enclosure expert to help you successfully, and safely, move forward.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, some pool designs do not have coping. However, most designers will extend the decking beyond the water's edge to keep water inside the pool and lower potential pool repair costs in the future. A pool without coping may look more seamless but can raise the risk of slipping and make it trickier to get in and out of the pool.

You don’t need to dilute the baking soda before adding it to your pool. While you can if you want, adding too much water into your pool can throw off your math and chemicals. Your pool’s circulation system will do most of the dissolving work for you, so it’s OK to skip the dilution.

The Mccook, NE homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.