Top-rated subcontractors.

Get matched with top subcontractors in Blair, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Blair, NE?

Select your specific project to find the pro for you.

TRUSTED BY BLAIR, NE HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon203
    Verified subcontracting services reviews

Find Subcontractors in Blair

Avatar for 402Plumbing Services
402Plumbing Services
4.9(
13
)

Serving Blair, NE and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"It was more complicated than anticipated. He worked very ho*** ** the hottest day of the year on my outside faucet. He is very pleasant and easy to work with. He answered all my questions. I recommend him."
Water Heaters Project
Kitchen Remodel
Copper Water lines replace
Wasn't done here, but you can see what the job consists of.
Replacement W/O Water heater $950
Or Labor cost $450

+33

Recommended by100%of homeowners
Avatar for Marathon Services Inc
Marathon Services Inc
4.3(
205
)

Serving Blair, NE and surrounding areas

In business since 1997

Free estimates

Emergency services offered

"Paul helped me understand how skylights work following a roof.replacement done by another vendor. I would use Marathon again and would recommend them to friend. Work was well done and timely."
Before
After
Before
After
Before

+4

Recommended by96%of homeowners
Avatar for MWC Construction
MWC Construction
4.1(
120
)

Serving Blair, NE and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"They did a very good job. The work took a day. Approximately 5 people did the work. They did very good with clean up. They even came back and did some additional clean up the next day."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by93%of homeowners
Avatar for Fancy Formations LLC
Fancy Formations LLC
5.0(
7
)

Serving Blair, NE and surrounding areas

In business since 2021

"Very pleased with the service I received. Remodeled kitchen cabinets. They look amazing. Fares was very professional and easy to talk to. Always on time would definitely recommend their company"
Remodeling - General Project
Interior Design & Decorating Project
Coffee table
Dining table
Custom made walk-in closet cabinets

+29

Recommended by100%of homeowners
Avatar for Premier Painting
Premier Painting
4.2(
57
)

Serving Blair, NE and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"They did what I asked at a reasonable price. I didn't want a perfect job since we were selling the house anyways, so he was very helpful in keeping the price reasonable and giving me advice about painting techniques."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by95%of homeowners
Avatar for One Stop Shop
One Stop Shop
5.0(
7
)

Serving Blair, NE and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"My experience with One Stop Shop was impeccable. Fred was very professional, knew what he was doing, and was quick. Will be going through them for pest control in the future again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by100%of homeowners
...
Showing 1-10 of 62
Subcontractors questions, answered by experts

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Professionals optimize layouts, improve energy efficiency, and ensure structural safety and compliance.

Yes, designing builds to fit space constraints and meet functional needs.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The Blair, NE homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.