Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Roaring River, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Roaring River, NC?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Roaring River

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Roaring River, NC and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for JT's Painting, Repair, & Restorations
JT's Painting, Repair, & Restorations
5.0(
3
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Roaring River, NC and surrounding areas

In business since 2022

Credit card accepted

We are a company that focuses on bringing quality work and craftsmanship back into the minds of people when they think of a handyman. Our motto is to bring you the quality that you've been missing. And we aim to do that with every job.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Patios & Sunrooms USA
0.0(
10
)
Swimming Pool - Above Ground - Build or InstallSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Roaring River, NC and surrounding areas

In business since 1990

Since 1990 Patio's and Sunrooms USA and Tropical Pools Inc is a company dedicated to customer satisfaction. We service areas in North Carolina, Virginia, and South Carolina as well as Indianna ! Our company can give you the finished product that you desire. With our years of experience we have distinguished ourselves from the competition and plan on providing top-quality services to each and every customer. We are also a Sams Club Vendor so if you are a Sams club Member you are entitled to their discounts. We also oddwe and provide 100% financing to those who need it.

Showing 1-10 of 13
Install Above Ground Pools questions, answered by experts

There are some companies that offer acid washes that do not require pool draining. However, the process can take several days and requires a bit more elbow grease to scrub the pool surface compared to draining it entirely. Since your pool surface and age are both a factor, work with a professional to choose the best method.

Yes, it’s possible to put too much salt in your saltwater pool, and doing so can cause a number of problems, including corroding metal parts and causing the chlorinator to stop working correctly. In general, slightly elevated salt levels won’t cause serious problems beyond salty-tasting water, but you should dilute the water in a pool with extremely high salt levels to prevent damage to its components.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

A pool chiller will take anywhere from 12 to 14 hours to lower your pool's temperature by 1 to 15 degrees. Most people tend to run their coolers overnight, but larger pools in warm climates take longer to cool. Choosing a chiller with the right capacity can help speed up the process.

Whether or not a pool needs a dedicated circuit depends on the electrical needs of the motor, lights, and pump. Keep in mind that pool motors can use a lot of electricity. A dedicated circuit can prevent the breaker from tripping whenever you use the pool. A small motor for an equally small pool may only need a GFCI outlet. It’s best to plug it directly into the outlet rather than using an extension cord. You should also consult an electrician to ensure your pool’s electrical system is in accordance with local regulations.

The Roaring River, NC homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.