Top-rated contractors.

Get matched with top contractors in Lillington, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Lillington, NC?

Select your specific project to find the pro for you.

Find Contractors in Lillington

Luxury Renovations INC.
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We specialize in all phases of remodeling for your home, business, kitchens, bathrooms, basement finishing, and more! We guarantee your satisfaction and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -- or-- click to schedule a free estimate today! \n

New sub floor
Bathrooms
Nursery
Kitchens
 Siding repair

+90

Response time8 hrs
2 neighbors recently requested a quote
Recommended by100%of homeowners
GRC Corporation
New to Angi
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \nCall us today you'll be pleased you did. Thank you

10 neighbors recently requested a quote
Avatar for King of Clean-KOC
King of Clean-KOC
4.8(
257
)
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

"Great! We generated online quotes through Angie's List to 4 contractors on 6/11/18. Only 1 emailed us with a quote (which was too high). We figured it was a dead end, got distracted with other things & forgot about it. Then a few weeks later we got a call out of the blue from Hector. He apologized for the delayed response as he said he had been very busy. It was a great call out of the blue. He said he could come out immediately & came out the next day as promised. We discussed the price once he saw my house & gutter system. He cleaned the outside of 4 skylights while he was up there. Hector worked very hard, cleaned up all the debris & left the outside of the grounds in great shape. Hector is very polite & a hard worker! I think you will be very happy if you give Hector a call."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+24

Recommended by96%of homeowners
Avatar for Clean Hands Painting & Construction LLC
Clean Hands Painting & Construction LLC
4.8(
418
)
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"This is the second time we have hired Junior and he continues to impress us. He is super responsive and works harder than any contractor we have hired. He has high standards and ensures that work is completed with a great attention to detail. He is so trustworthy and honest; we left him with keys to our home. He goes above and beyond and is an absolute pleasure to work with from start to finish!"
Interior Painting
After
During
.
Additional Photos

+17

Recommended by96%of homeowners
Avatar for HAMMER HANDYMAN SERVICES
HAMMER HANDYMAN SERVICES
4.7(
11
)
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

In business since 1994

Free estimates

"He is thorough, and very detail conscience.  His work and pricing is straight forward.  He separates the cost of Labor vs Parts and Supply.  This means you can see there are no hidden markups in the total estimate.  This is the most tricky part of most estimates, and why Hammer Handyman sometimes 'seems' more expensive.  I have been low-balled by many contractors, and then suddenly towards the end of the project there is some cost over-runs that were never estimated or Parts and Supply from companies I have never heard of that all of a sudden I need to install or the project will not finish.  I never feel that I am being fleeced with Don."
Additional Photos
Additional Photos
Additional Photos
Recommended by90%of homeowners
Avatar for Divine Design & Remodeling
Divine Design & Remodeling
4.7(
18
)
Major Home Repairs (General Contractor)

Serving Lillington, NC and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"Things we liked: 1. Detailed contracting and pre-work planning, with detailed materials and labor estimates. 2. Provided evidence of license and insurance. 3. Excellent design, excellent materials, and precise construction of high-quality custom cabinetry and other wood work, including under-cabinet LED lighting, and fireplace mantle. 4. Negotiated with vendor to get good price and extended warranties included in the cost of all new kitchen appliances. 5. Nice installation of tile floors in kitchen, bathroom, and laundry room. 6. Excellent installation of stacked limestone panels floor to ceiling on a high angled wall around the fireplace, plus very attractive custom-made wood mantle, and new tiles on the hearth. 7. Worked effectively with vendor on design, purchase, and installation of premium granite countertops and trim, and kitchen and bathroom sinks. 8. Installation of premium plumbing fixtures in bathrooms and kitchen, no leaks apparent. 9. Well-done side job of installing two new steps, small landing, and wood screen door with dog flap on the deck. 10. Very cooperative about several minor design and installation changes along the way, with acceptable cost changes. 11. Contractor was on-site nearly every weekday and on many weekends. 12. Contractor is friendly, polite, considerate, and very aware he is working in someone’s home. Things that disappointed us: 1. No advance communication on one-week delay in starting the job. 2. Time estimates. We were told at least 3 weeks in a row that he would be done “next week.” Job actually took twice as long (about 15 weeks) as the original time estimate (6-8 weeks). We can allow one extra week for the changes and add-ons we asked for, but not double for the entire job. 3. Erratic attendance of assistants on the job appeared to contribute to significant delays. 4. Delegated cabinet finishing (staining and water-repellent top coats) to assistant, whose work had to be re-done in multiple places and still detracts from otherwise beautiful wood work. 5. Trim work is absent where cabinet panels meet hardwood floor, leaves what we consider a very unattractive gap. 6. Installation of wall tiles. The tile vendor did not tell us the tiles we picked for floors and shower walls were not for walls; the contractor had a hard time making them stay on the walls. I suggested changing wall tiles but contractor assured us that he could cut and install to get the look we wanted; tiles had to be cut, installed, torn off, and re-installed; were held onto concrete backer board with nails until cement dried, putting holes in the backer board behind the grout lines; tiles cut at angle for exposed corners were ragged and retained grout unevenly, and there was no accommodation for corners, so after the job was done we ordered and installed plastic corner guards with silicone (total cost of materials and shipping approx. $125) to cover unattractive and sharp tile edges. I estimate that installation of shower wall tiles alone took 2 weeks, maybe more. For the kitchen backsplash, smaller tiles were used and installed well, but there was no accommodation for where backsplash would transition to drywall, so tiles at drywall had edges exposed; we ordered edge pieces off-contract from a home improvement store, contractor installed them. It appeared to us that the contractor did not plan for tile corners and transitions. 8. Drywall and paint work. Drywall around arch that widened a doorway was not taped, and contraction of the mud has created a crack around the arch. Drywall work where lights and ceiling fans were moved and/or installed is lumpy and visible; one place on the ceiling was not finished and the supporting mesh is obvious right on the surface. Paint where the ceiling paint meets the shower wall tile grout is on the grout and cannot be scrubbed off and in our opinion will need to be covered by crown molding to make appearance acceptable to us, something we did not plan. Other places where wall tile meets drywall show evidence of damage to the drywall surface (e.g., surface paper torn off) that was not repaired, so it is uneven and lumpy. Bathroom was to be repainted, but not all trim was repainted, including a window that was caulked with colored caulk on white paint. The wall with the arch and the kitchen walls involved in wall cabinet installation were only partially repainted with the same color but different roller texture can be seen; the whole walls must be re-painted for uniform appearance. 9. Organization and worksite management. Our homeowner association informed us that neighbors grew impatient with the construction trailer and trash in the driveway, which were present from mid-November to early March. In general, we were unhappy with protection of the work site. Garage floor and wood steps have sizeable spots of paint and stain. Hardwood floors in the highest-traffic area were protected with cardboard only after we insisted on it, and then there were still paint cans and tools stored directly on the dining room hardwood floor. Stain cans were routinely left uncovered overnight. New tile floors and granite countertops were not protected from subsequent cabinet staining, so we did a lot of post-construction removal of paint, stain, glue, etc., from tiles and expensive granite that could have been protected, even with newspaper and masking tape. Grout haze was left on new tile for at least a week and then was incompletely removed; we spent several days scrubbing it off with white vinegar. Two manuals for new appliances were lost. Job proceeded in a sequence that was hard for us to understand or predict, perhaps depending on when assistants were available (a guess?), so there was little completed and usable across three rooms for more than three months. 10. Contract oversight/business management. Extended warranties for kitchen appliances (refrigerator, gas range, microwave oven, dishwasher) were supposed to be part of the package cost but the invoice the contractor presented to us did not include extended warranties on two of the four; I contacted the vendor, purchased the two warranties by credit card, and backed this cost out of the contract. Contractor deviated from the contract’s payment schedule, asking for unscheduled early payments to cover labor costs. Contract called for all invoices for materials to be presented; most were not. We presented an extensive punch list toward the end of the job, which we added to as we found things that needed to be corrected. We found at least one or two items that he crossed off but were not done. 11. Complete lack of follow up. This is a serious problem to us, given our financial and time investment. Before and during the job, we communicated well by text message and email. Since he finished on March 2, I have contacted him 5 times to request a time we could meet and talk about issues described here; he responded quickly to the first two messages saying he would get back to me, but didn’t, and he has not responded at all to the last three attempts to contact him since April 8. The contract has an arbitration requirement, but the contractor used his home address as his business address but moved during the job, and we do not have a mailing address for him, so we are unsure how to invoke arbitration. I contacted a handyman service on Angie’s List to get an estimate to correct several items described above; this estimate is $1,350 on top of the cost of the renovations in general. This review will stand until the contractor contacts me and corrects what we consider to be deficiencies. I will consider an update if he does. Overall grade: C. I would not use again."
Decks
Baths
Trim
Additional Photos
Additional Photos

+2

Recommended by84%of homeowners
...
Showing 1-10 of 147
Unfinished Carpentry questions, answered by experts

A-frame homes are on the smaller side. While there’s no set square footage amount it has to be, it will usually come in around 1,000 square feet or smaller.

House framing can be expensive because the materials are pricey, and the job requires a high level of expertise. The more complex the plans, the more expensive the job, but even the most basic frame needs to be installed with high-quality materials and precision. When pricing your home’s framework, remember that a sturdy frame is necessary to create a safe structure.

You should avoid drilling or cutting into load-bearing beams because removing material will weaken it and increase the risk of structural damage or even collapse. If you do need to drill into a load-bearing beam, speak with a structural engineer first to discuss where it’s safest to drill and the width and depth of the bit that’s safe to use.

Begin by analyzing the blueprints and gathering the proper materials before framing a house. With the prep stages behind you, begin by framing the floor of a house on the newly set foundation. Exterior and interior walls come next, along with rough openings for doors and windows. Contractors will then add ceiling and roof rafters to finish things off. 

Converting a carport into a garage can vary in difficulty depending on its configuration, the condition of the foundation or slab, and its location relative to the house. The process has a lot in common with a home addition, but you can often skip non-essential finishes like fine flooring, trim work, or even drywall and HVAC. The conversion requires experience with drywall, insulation, and other building materials to ensure it’s done safely and correctly. While it might be possible for a DIYer with the proper tools and skills to do the work, it is a complicated and potentially dangerous job. If you’re new to basic construction, it's best to leave this project to the professionals.

The Lillington, NC homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.