Top-rated subcontractors.

Get matched with top subcontractors in Autryville, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Autryville, NC?

Select your specific project to find the pro for you.

TRUSTED BY AUTRYVILLE, NC HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon174
    Verified subcontracting services reviews

Find Subcontractors in Autryville

Avatar for Sunrise Remodeling
Sunrise Remodeling
4.3(
36
)
Major Home Repairs (General Contractor)

Serving Autryville, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2000

Free estimates

Emergency services offered

"The room addition went great. Mr Porter was very efficient. Kept me up to date in all aspects of the build. He pays attention to detail. His pricing was very fair. I have used this company multiple times. In 2009 ,he completed a kitchen remodel for me. I would recommend him to anyone needing a project done."
Before Remodel
After Remodel
Before Remodel
After Remodel
Before Remodel

+81

Response time4 hrs
Response rate100%
6 neighbors recently requested a quote
GRC Corporation
New to Angi
Major Home Repairs (General Contractor)

Serving Autryville, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \nCall us today you'll be pleased you did. Thank you

5 neighbors recently requested a quote
Mighty Hands Roofing Inc
4.2(
461
)
Major Home Repairs (General Contractor)

Serving Autryville, NC and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"After the repair was done I noticed a leak in my bathroom ceiling where one of the roof vents were replaced. I called the Subcontractor Brian on a Saturday morning. The weather was cold and raining. He was at my house within the hour up on the roof and fixed the leak. I havent had any leaks since. I would hire Brain the Subcontractor again."
Recommended by80%of homeowners
Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)
Major Home Repairs (General Contractor)

Serving Autryville, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"I would highly recommend this business.  We had them come and restain the deck and at first just powerwash the house.  They scheduled the work right away.  After doing the pressure washing, there were some areas with paint chips under the soffit.  Mike offered to repaint those for free.  During this, they noticed areas of the soffit that were rotten, so we had them repair those areas of the wood.  They also fixed a few screens that were damaged during the pressure washing for free.  
Everything turned out great, and we are very happy we had this work done.  Mike and Crystal are very professional and easy to work with.  I will be having them do some more work on our house in the near future.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
...
Showing 1-10 of 90
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

New constructions, renovations, and interior layouts benefit from expert drafting.

The costs depend on the type of wood, labor, roofing material, permits, and whether additional storage or enclosed walls are included.

The Autryville, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.