Top-rated basement remodelers.

Get matched with top basement remodelers in Aberdeen, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Aberdeen, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Aberdeen

Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

Free estimates

Credit card accepted

"Top quality work, great prices and extraordinary people! I look forward to working with this Company again, so needless to say, I highly recommend them! Great work, and keep it up."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Avatar for Loves Construction and Landscaping
Loves Construction and Landscaping
5.0(
7
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Love’s construction and landscaping routinely maintains multiple properties for our business along with my personal residence, this company goes above and beyond to make sure everything is done to perfection, I recommend this company to anyone. The owner Dakota is very profession and easy to talk with!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by100%of homeowners
Avatar for Country Boyz Construction
Country Boyz Construction
4.6(
10
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Bobby is amazing at what he does…. We had the flooring already that we wanted installed and thought it was going to be an easy job, but my flooring was not what we thought it was made of…. The flooring was very thin and could break easy, so it made it harder to install or at least from what I was seeing…. But he started doing it and made it look easy… So what I thought was going to take forever to complete, and he completed it in a day… And that included him going out to get more Baseboards, installing that as well, and cleaning up everything…. I cannot wait to hire him to replace my deck…. Thank you Country Boyz Construction…."
Previous wood deck
Previous wood railing
Remodel Entire Home
Metal Roof
Unfinished former roofer

+155

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 38
Basement Remodel questions, answered by experts

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Aberdeen, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.