Top-rated basement remodelers.

Get matched with top basement remodelers in Aberdeen, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Aberdeen, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Aberdeen

Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

Free estimates

Credit card accepted

"Top quality work, great prices and extraordinary people! I look forward to working with this Company again, so needless to say, I highly recommend them! Great work, and keep it up."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Avatar for Loves Construction and Landscaping
Loves Construction and Landscaping
5.0(
7
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Love’s construction and landscaping routinely maintains multiple properties for our business along with my personal residence, this company goes above and beyond to make sure everything is done to perfection, I recommend this company to anyone. The owner Dakota is very profession and easy to talk with!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by100%of homeowners
Avatar for Country Boyz Construction
Country Boyz Construction
4.6(
10
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Bobby is amazing at what he does…. We had the flooring already that we wanted installed and thought it was going to be an easy job, but my flooring was not what we thought it was made of…. The flooring was very thin and could break easy, so it made it harder to install or at least from what I was seeing…. But he started doing it and made it look easy… So what I thought was going to take forever to complete, and he completed it in a day… And that included him going out to get more Baseboards, installing that as well, and cleaning up everything…. I cannot wait to hire him to replace my deck…. Thank you Country Boyz Construction…."
Previous wood deck
Previous wood railing
Remodel Entire Home
Metal Roof
Unfinished former roofer

+155

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Aberdeen, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 38
Basement Remodel questions, answered by experts

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The Aberdeen, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.