Top-rated basement remodelers.

Get matched with top basement remodelers in Carthage, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Carthage, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Carthage

Avatar for ooommee llc
ooommee llc
4.9(
57
)
Basement - Remodel

Serving Carthage, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2007

Warranties offered

Credit card accepted

"The guys relocated my washer and dryer and moved it to my sunroom. They created an enclosure to hide the units. I am happy the way things turned out. They were efficient and cleaned up after."
Bunnlevel, NC Deck Restoration
Sanford, NC Deck Refurbish
Rocky Mount, NC Trex Deck Refresh
sunroom
Bunnlevel, NC Deck Restoration

+326

Response time2 days
Response rate100%
4 neighbors recently requested a quote
Avatar for Good Homes
Good Homes
4.8(
5
)
Basement - Remodel

Serving Carthage, NC and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"Have never been more pleased at the execution of a skilled trademan. Chad's extensive knowledge and labor of remodeling has always been top shelf! As a 32 year Facilities Manager, I've used him on many commercial and residential projects and have never recieved less than high praise for his work. His attention to detail set him apart from any contractor I've encountered. My projects with him includes Historic properties, commercial, and residential. His honesty with pricing has assisted me and others involved in successfully completing major projects within time allocated. Would hire him over and over."
Shed Interior
Shed exterior
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Avatar for Cobalt Roofing & Construction
Cobalt Roofing & Construction
3.9(
212
)
Basement - Remodel

Serving Carthage, NC and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"

We had a minor leak in my bedroom closet. He went into the attic and could not see where the leak was coming from. He looked for the leak from the roof as well and he let me know that my roof should have about 7 years left in it. He was on time and polite but only at my home for about 15 minutes. 

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+39

Recommended by82%of homeowners
Avatar for Well Done Construction & Remodeling LLC
Well Done Construction & Remodeling LLC
5.0(
9
)
Basement - Remodel

Serving Carthage, NC and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I contacted several contractors about doing the work I needed done. Tony was the only one that stayed in contact with me and completed the job in 2 days Outstanding company to do business with. Very professional and high quality performance. I will use this company again on future projects. Highly recommend this company to anyone wanting home improvements done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by100%of homeowners
Showing 1-10 of 42
Basement Remodel questions, answered by experts

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The Carthage, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.