Top-rated basement remodelers.

Best basement remodelers near Fort Bragg, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Fort Bragg, NC?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Fort Bragg - Updated Nov 2026

Avatar for ooommee llc
ooommee llc
4.9(
62
)
Basement - Remodel

Serving Fort Bragg, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2007

Warranties offered

Credit card accepted

"Ooommee LLC was great to work with. Danzy, the owner, was very personable. He was very helpful and understanding. My husband and I had a very strained budget, yet he did everything he could to work around that when no one else would even give it a shot. The basement was not an easy renovation by any means. He collaborated with other pros to get what needed to be done finished & done in the time frame we needed. By the end of this project Danzy felt like family to us. Thank you to all who helped complete this renovation for my family. We are truly grateful! 110% recommend Ooommee LLC for great affordable services for your home."
Bunnlevel, NC Deck Restoration
Sanford, NC Deck Refurbish
Rocky Mount, NC Trex Deck Refresh
sunroom
Bunnlevel, NC Deck Restoration

+326

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Cobalt Roofing & Construction
Cobalt Roofing & Construction
3.9(
212
)
Basement - Remodel

Serving Fort Bragg, NC and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"

We had a minor leak in my bedroom closet. He went into the attic and could not see where the leak was coming from. He looked for the leak from the roof as well and he let me know that my roof should have about 7 years left in it. He was on time and polite but only at my home for about 15 minutes. 

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+39

Recommended by82%of homeowners
Avatar for John Gaster Construction
John Gaster Construction
5.0(
8
)
Basement - Remodel

Serving Fort Bragg, NC and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"John and his son did excellent work for us and were very reasonable.They were extremely dependable and kept us informed about any problems that should be addressed. My husband and I were very confident in their level of expertise and will definitely use them again should the need arise."
Decks and Windows
Screen porch
Decks and Windows
Screen porch
Decks and Windows

+29

Recommended by100%of homeowners
...
Showing 1-10 of 56
Basement Remodel FAQs, answered by experts

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Fort Bragg, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.