Top-rated contractors.

Get matched with top contractors in Morehouse, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Morehouse, MO?

Select your specific project to find the pro for you.

Find Contractors in Morehouse

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Morehouse, MO and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Siding Repair Systems
Siding Repair Systems
4.5(
128
)

Serving Morehouse, MO and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"First let it be known that I have waited a period of time after completion as I wanted this to be a honest not a plain and acirc;??P***** Offand acirc;?? review. Details: my start date was set for the contractor to be out first thing on 5/28/14. I took the week off from work to be sure that anything that was needed to be done by me could be handled immediately. When the sub-contractor (not verified subs but they kept taking phone calls for what sounded like non-Siding Repair Systems jobs) on my time. They did not arrive and I called a bit frustrated that no one showed and Cory the and acirc;??Bossand acirc;?? said the current job they were on they ran into a mold problem. I told them that they could come out the next day then and was told they would be there. I believe I should have at least received a phone call explaining they could not make it and to ask for a re-schedule. That did not happen on day 2 or day 3. I was asked if they could pay the installer double time and if I could be there on Sunday. I was OK with that and they did not show at the arranged time of 9-10 oand acirc;??clock. So I called Cory yet again (about 5 times now making this same call) and he did not have much to say but he would call them. Finally they showed for the first time walked around the house a bit and left saying they were to get the materials that should have been on their truck before they showed up 3 hours late. When they got back and started removing the old siding they left the house open to the elements and it rained heavily that night. Next day (Monday) they did not show ti Mid-afternoon again and that was the way the whole thing was. They did a couple hours and left. However my wife works a big box hardware store and she Note that the siding they were putting up did not look like the James Hardie siding we were paying for. I challenged them on that and when they looked they realized that they made a mistake. Now I thought to myself if it would not have been for the observation of my wife they would have completely sided the house with the wrong material and charged us for the Hardie siding and if we were normal consumers we would have never known. Makes one wonder if that is a new and acirc;??bait and switch and acirc;?? tactic? Then they had to go get the Hardie Siding and the boss Cory calls now that they were caught with the wrong stuff 50% on the walls and asks if I would be willing to take the lesser siding at a lesser price. I said no as I and acirc;??trusted themand acirc;?? to do the right thing. Finally after 3 more days of being late and 3 strong rain storms the job was done. It does look good BTW canand acirc;??t fault that I guess. To end the story I have to make 2 more calls for them to get the trash completely removed and that was only after I threaten them by having American Express withhold payment. I would not recommend this outfit to anyone. I lost 24 hours of vacation due to them not showing up as promised, the trash left around my house, and the and acirc;??presumedand acirc;?? mistake of the wrong siding. I read all the previous reviews on Angieand acirc;??s List and based on my experience I tend to believe they are forgeries. BEWARE is my only warning!!!!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by89%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Morehouse, MO and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for HILL AND HILL, LLC
HILL AND HILL, LLC
4.5(
10
)

Serving Morehouse, MO and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"I would highly recommend Greg Hill. He’s a great guy and he knows what he’s doing. We appreciate all the work he did on our new church project. He took a 112 year old building and turned it into a modern day sanctuary, kids church and offices. We are totally loving it."
Response time9 hrs
Recommended by60%of homeowners
Showing 1-10 of 35
Unfinished Carpentry questions, answered by experts

The primary parts of a house that need framing during construction are floors, exterior walls, interior walls, and the roof. The framing in these areas provides the skeleton for adding other materials over the top. With walls, for example, contractors can hang drywall over the interior walls and siding over the outside of the exterior walls. Proper framing ensures a sturdy house that is built to last.

Installing an ornamental or decorative porch column takes around three to five hours. Structural columns take longer because your pro has to install a jack to hold up the roof while switching the column out. If there's any structural damage, it can add several days to the timeline to repair the damage.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Building involves setting foundation posts, framing with durable wood, adding roofing support, and protecting from elements with water-resistant finishes.

A-frame homes are on the smaller side. While there’s no set square footage amount it has to be, it will usually come in around 1,000 square feet or smaller.

The Morehouse, MO homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.