Top-rated contractors.

Get matched with top contractors in Clarkton, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Clarkton, MO?

Select your specific project to find the pro for you.

Find Contractors in Clarkton

Shane Hampton
New to Angi

Serving Clarkton, MO and surrounding areas

Approved

In business since 2013

Free estimates

Locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of quality home improvement services. You will find us to be competitively priced with close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Clarkton, MO and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Siding Repair Systems
Siding Repair Systems
4.5(
128
)

Serving Clarkton, MO and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"First let it be known that I have waited a period of time after completion as I wanted this to be a honest not a plain and acirc;??P***** Offand acirc;?? review. Details: my start date was set for the contractor to be out first thing on 5/28/14. I took the week off from work to be sure that anything that was needed to be done by me could be handled immediately. When the sub-contractor (not verified subs but they kept taking phone calls for what sounded like non-Siding Repair Systems jobs) on my time. They did not arrive and I called a bit frustrated that no one showed and Cory the and acirc;??Bossand acirc;?? said the current job they were on they ran into a mold problem. I told them that they could come out the next day then and was told they would be there. I believe I should have at least received a phone call explaining they could not make it and to ask for a re-schedule. That did not happen on day 2 or day 3. I was asked if they could pay the installer double time and if I could be there on Sunday. I was OK with that and they did not show at the arranged time of 9-10 oand acirc;??clock. So I called Cory yet again (about 5 times now making this same call) and he did not have much to say but he would call them. Finally they showed for the first time walked around the house a bit and left saying they were to get the materials that should have been on their truck before they showed up 3 hours late. When they got back and started removing the old siding they left the house open to the elements and it rained heavily that night. Next day (Monday) they did not show ti Mid-afternoon again and that was the way the whole thing was. They did a couple hours and left. However my wife works a big box hardware store and she Note that the siding they were putting up did not look like the James Hardie siding we were paying for. I challenged them on that and when they looked they realized that they made a mistake. Now I thought to myself if it would not have been for the observation of my wife they would have completely sided the house with the wrong material and charged us for the Hardie siding and if we were normal consumers we would have never known. Makes one wonder if that is a new and acirc;??bait and switch and acirc;?? tactic? Then they had to go get the Hardie Siding and the boss Cory calls now that they were caught with the wrong stuff 50% on the walls and asks if I would be willing to take the lesser siding at a lesser price. I said no as I and acirc;??trusted themand acirc;?? to do the right thing. Finally after 3 more days of being late and 3 strong rain storms the job was done. It does look good BTW canand acirc;??t fault that I guess. To end the story I have to make 2 more calls for them to get the trash completely removed and that was only after I threaten them by having American Express withhold payment. I would not recommend this outfit to anyone. I lost 24 hours of vacation due to them not showing up as promised, the trash left around my house, and the and acirc;??presumedand acirc;?? mistake of the wrong siding. I read all the previous reviews on Angieand acirc;??s List and based on my experience I tend to believe they are forgeries. BEWARE is my only warning!!!!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by89%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Clarkton, MO and surrounding areas

In business since 2006

Credit card accepted

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
Showing 1-10 of 35
Unfinished Carpentry questions, answered by experts

The cost to frame a 2,000-square-foot house can fall anywhere between $14,000 and $32,000. This price can increase or decrease depending on what type of framing you choose, the quality of the materials, the project's complexity, and whether you decide to hire a professional to do the job.

In framing, studs are placed at 16-inch intervals to coincide with the typical spacing of wall materials such as drywall or plywood. This spacing is called "on-center" and is necessary for maintaining structural stability and efficient use of materials. The 16-inch spacing also helps to distribute the weight evenly across the building's structure. For those looking to cut material costs and improve energy efficiency, 24-inch stud spacing can be employed through a method called "advanced framing". This requires careful planning and adherence to local building codes to ensure structural integrity.

Yes, most services include necessary frame modifications for proper door fitting. Confirm with your provider.

Yes, using certified lumber and engineered wood products for reduced environmental impact.

Metal stud framing parts include the studs themselves, upper and lower tracks that act as top and bottom wall plates, various angle fasteners and clips, screws for fastening pieces togeher, metal straps, c-channel supports, and thicker steel supporting structures. Roof framing metal components include pre-fabricated trusses, heavy-gauge stud pieces, and various plates and fasteners.

The Clarkton, MO homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"