Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kaiser, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kaiser, MO?

Select your specific project to find the pro for you.

TRUSTED BY KAISER, MO HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon21
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Kaiser

Avatar for Firebird Concrete & Pools, Inc.
Firebird Concrete & Pools, Inc.
4.6(
22
)
Concrete Driveways - Install

Serving Kaiser, MO and surrounding areas

Approved

In business since 2010

Free estimates

Customers say: Terrific value

"I had a new concrete floor poured in my basement (was dirt) and had a trap door and stairs built to the inside of my house. I was absolutely AMAZED at the quality of work! I am so pleased with the work I received that I plan to have a concrete driveway, carport, walk-way and back yard patio poured. And I don't want anyone else doing this work but Firebird! Dustin & Kelly you're the best!"
Ashlar Slate stamp - candy apple red
Ashlar Slate stamp
Slate stamp - before being sealed
Stamp - before being sealed
During project

+37

Response time1 day
Recommended by90%of homeowners
...
Showing 1-10 of 84
Asphalt Driveways questions, answered by experts

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

Yes, with colored finishes and decorative stamping for a personalized touch.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

Overall, a paver driveway is considered the easiest to maintain because homeowners are able to do driveway repair one piece at a time without impacting the rest of the driveway. Unlike paved options, paver driveways contain individual stones that aren't physically connected. By comparison, you may need to reseal or redo a full asphalt driveway if just one portion sustains a significant crack.

The Kaiser, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.