"Terbrock's team showed up on time and did the work professionally and carefully -- like it was their own personal home improvement project. At the end of the day, Tom Terbrock himself showed up to make sure everything went well. The price for the work, including removal of existing fixtures, installation, and clean-up, was more than reasonable."
"I had Swenson Builders build custom shelving in my garage. They turned out great and the job was done professionally and efficiently. Very happy with the storage spaced added."
"Sentri Homes provided the most professional flooring service I’ve ever had. The LVP installation turned out absolutely beautiful, and I was amazed at how quickly everything was completed without sacrificing quality. The crew was fast, accurate, and extremely detail-oriented from start to finish. Everything was installed cleanly, precisely, and with real craftsmanship. The entire process was smooth, efficient, and far beyond what I expected. I would absolutely recommend Sentri Homes to anyone needing flooring installed."
Were a family owned and operated company that values honesty and integrity, and stands behind our work. We offer over 40 years of industry experience. We specialize in Asphalt Shingle Roofing installation, replacement, and repairs. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!
"Al did a phenomenal job! He was on time for the job. He is very professional! He actually charge $766, and I have him a $50 tip for his great service! He sent me pictures of all the work that needed to be done before and after! I was very impressed with his work."
"Chris and his crew made sure they knew my style and what I was looking for in my family room makeover. He built our mantle and shelves from scratch and we couldn't be happier with the way in turned out!!"
"I had some loose metal that was very dangerous if it had broken off. Mr Freeman was near by and was able to come reattach the metal. It was really cold but that didn't stop him from reattaching the loose portions. I was really grateful for the emergency work."
"We dealt with Tom Earle. It was not as good as we have liked, but it was good enough. I did not think that they were working half hours. All of the contractors worked similarly. They come in about 9 o’clock and leave at 3:04 everyday. There were only few exceptions when we started to complain. Then, in the beginning they had a couple of people here. Sometimes it had been three, and then many days, they used to have one person. When we asked them what happened, they said they were working on other jobs too. So, it is a small company, but then I guess they just want to have as many contracts as possible so at times they were spread kind of thin. That prolonged the construction project. It took longer than originally planned. The pricing was pretty good. I saw a couple of other contractors, and theirs came out pretty good. I am not exactly sure about the quality of their work because it is hard for me to compare someone else because we have not had such a large project, but I came to believe that there were situations where the quality could have been better because we asked them to redo a few things. So, of course after we started to pay more attention and complain about their quality then they kind of put more time into it or give it more attention. It is not something that I would consider automatic. It is okay. I am going to do the best I can. It seemed like if you do not complain, then, they will get away with whatever they could possibly get away with. That is the way I see it. I felt that maybe all the other contractors are not like this. I think there are exceptions. They do the best they can and there are also others who can do better, but they do not seem to do so unless you start complaining about it. They are a little bit like that. I thought they did finish okay. They were pretty good in listening to our needs and so with regards to responsiveness, they are pretty good. When you start talking about the allocation of resources and things like this, we were competing with his other projects. I do not know if responsiveness included that or not because the whole project stood up more than a month, even more than the hundred day week. We had previously worked with a smaller scale contractor and he would come here at the earliest as he could. He asked us when he could come in, and he told us that if he could come at 7:30 that that would be better. So, we told him to come at 8. A lot of times he would stay and work until like 5 or 6 until we need to eat dinner. A lot of times he would also come in on weekends on work. For Good Neighbors, they are definitely not like that. They would come in around 9 o’clock sometimes even later or until we ask where they are. The project has been delayed and they did not come in. Maybe they have longer drives that they had to do and they leave early too. A couple times, when we really complained a lot, then they brought some people in over the weekend. Those guys came in voluntarily to work I guess because they were pretty conscientious. They are subcontractors to Good Neighbors. When we started complaining, they came in over a few times over the weekend just to catch up. If that is the hours, they would say they were punctual because they were showing up at time they were suppose to show up, but from our perspective, I go to work at 8 in the morning and come home at 5; you are not doing the same. They were pretty professional. I would have to say that in all situations that they handled themselves pretty professionally. What we have to do is that if we are going to use them in the future, we really have to manage them which I do not think that we should need to do quite to the detail of our level that I think we need to do. They are professional in working on the project, getting the details, and telling us what is going on. Those type of situations, but we would definitely want to enforce the amount of time. If they say they could finish this in eight weeks, then we would expect them to get done in eight weeks and not 50% longer. We would have to manage it from a time perspective a lot closer. If that is the case, I would reuse them. I think from their perspective, they are putting themselves in this situation purposely because they need to have the work like okay I have finished one place; I do not want to have a slack time. I just want to work and work all the time. In order to do that, they accept projects which may overlap. When they started ours, they were actually finishing up on the other one. Then, something happened with the other project that they could not finish because of late deliver or something was not delivered as expected or they had to return it. Things like this. When they were supposed to start on ours full-time, they were not able to do that because they were still working on this other project. When I look at their point of view to manage your business, they have to do that, but then the customer would suffer like us. They need to hire more people. I guess they trust the people they work with. They do not have to watch over them. I think they work with their subcontractors and other people. They do have their own people but not many, one or two. The subcontractors that they hire, I think they trust them because they have special skills that they do not have. They come and do the work. Their relationship with their contractors that I do not know if they can just hire based on their need at the time and then let the people go when they are able to handle. I think they do not want temporary help. They want to have a long-term relationship with their contractors. I empathize with them because I understand the situation they are in, but at the same time, we are their customers. We are selfish about our own project. So, we want complete attention from them which they are not able to give us. "
Custom Home Builders questions, answered by experts
Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.
Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.
The average cost to build a modular home is around $270,000, and most modular homes total between $180,000 and $360,000. Of course, this price varies significantly by location, and the price tends to follow the cost of living in the area. There are quite a few other factors at play that can affect your pricing, including the following:
Number of bedrooms and bathrooms
Site preparation, including land clearing and leveling
Type of foundation
Utility connections
Cost of building permits
Typically, architects do not build homes in a hands-on sense of doing the actual framing, roofing, or other building. Architects usually do not have the training and experience to build the homes they design. An architect would need to know how to do the specific trades required to build a house, which is possible but not a common practice. A general contractor or homebuilder typically oversees the actual details of building the house that the architect designs.
Ranch and colonial-style homes are often the most affordable to build. They have a common layout with available designs that are easy to adjust in simple ways without having to spend too much on a structural engineer or architect. Both types of homes' symmetry, simple roofs, and often one or two-story plans mean they often fall in the $150 to $200 square-foot range, putting them right around average.
The Frontenac, MO homeowners’ guide to custom home building
From average costs to expert advice, get all the answers you need to get your job done.
Wondering how much it costs to build a house in St. Louis, MO? Use this guide to cover all your bases, from permits and planning to construction and finishing touches.
Garages increase curb appeal and have a high ROI. Use this guide to learn about the average cost to build a garage in St Louis, MO, and budget for your project.
Find out the average architect cost in St. Louis, MO. Learn what you can expect to pay for local design services and get your home project started today.
Building your dream home starts with hiring a builder. Here is how to find a builder who understands your needs and preferences for your brand-new home.