Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Pine River, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Pine River, MN?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Pine River

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Pine River, MN and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Frank Haydon
2.8(
5
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Pine River, MN and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Frank was very knowledgeable. He did an excellent job with the pool, pricing was more than fair and he was always making sure I was happy with the way things were going throughout the entire process. I would recommend him again any day and I will be brining him back again when I add more upgrades to the pool room."
Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

If you put too much baking soda in your pool, your alkalinity will rise. That means you’ll need to take steps to lower your alkalinity. You can either add more water (which will require more chemicals because they’ll be diluted), wait for the alkalinity to lower naturally, or use a chemical like muriatic acid to lower it. 

Generally speaking, you should expect to wait 24 to 48 hours after filling a pool before you use it. However, the actual timeline depends on a few factors. Most importantly, you need to shock the water with chlorine or an alternative to swimming pool chlorine and let the concentration come down to a safe level before using the pool. Additionally, most water sources will be cold, and it can take days before the sun or your pool heater warms your water to a comfortable temperature. Alternatively, getting water professionally delivered could have you swimming in just a few hours.

No, stock tank pools do not get too hot, even when they are set up in a sunny location. Many stock pools are made with galvanized steel and are designed not to get too hot to touch. When your pool is full of water, it is less likely to get hot. The water might be warmer than it would be in an above-ground pool, but it will not be uncomfortable.

If you have kids and want to be extra cautious about the temperature of the stock tank, you may want to set up an umbrella for shade over the pool area.

Permits are generally required to build an in-ground swimming pool. These permits cover aspects like zoning, safety fencing, and electrical work. Obtaining the correct permits involves coordination with local building authorities.

Completely refreshing the water in an aboveground pool every five to seven years helps keep it free of bacteria and algae. Emptying the pool also allows you to clean, repair, or replace the pool liner. Schedule your water change when the weather is mild, as intense heat or cold can damage the pool liner when the pool is empty.

The Pine River, MN homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.